NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 427 pages

Permit application, Education Dept.

Machine-extracted title · confidence 15%

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

NYC-WTC_000245464–000245890
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

De PAR TM ENT OF Tran SPORTAT I ON • The Department extended Staten Island ferry service to every half hour on weekend nights of Staten Island Yankees home games, from 7:00 PM until 11:00 PM, In July 2001 the Staten Island Ferry also began providing service from the St. George Terminal to Coney Island for the Staten Island Yankees/Brooklyn Cyclones 2001 seasons.

• A groundbreaking ceremony for construction of the Whitehall Ferry Terminal was held in September 2i '. The project includes a new terminal structure that maximizes waterfront views while providing state-of-the-art comfort tc riders through new waiting areas. Improvements to the terminal include pedestrian circulation and connections to subways and buses. Construction will continue in multiple phases so that two of three ferry slips will remain available at all times. The project is planned for completion by the end of Calendar 2003. ( • The groundbreaking ceremony for the $85 million renovation of the St. George Ferry Terminal in Staten Island occurred on September 6, 2001. The facility will be completely remodeled both inside and outside. Planned improvements to the 50-year-old facility include upgraded utility and fire protection systems, increased retail space, air conditioning in the waiting room and additional elevators to improve access for people with disabilities. When completed, the St. George Ferry Terminal will provide a viable link to the new Yankees minor league baseball stadium, as well as to the planned Lighthouse Museum and other public waterfront attractions. State-of-the-art advertising and signage will help to integrate the terminal with the surrounding amenities. Continuous ferry service will remain in place during the reconstruction period. Project completion is scheduled for January 2004.

• The new Wall Street Ferry Pier at Pier 11 has continued to serve an important role in transportation to and from Lower Manhattan. Even after the opening of Pier A, located between Battery Park City and Battery Park, passenger volumes at the Pier remain approximately double their pre-September 11* levels. DOT has brought a temporary food concessionaire into the pier while arrangements are being made for the issuance of an RFP to select a longer-term concessionaire.

• The Department has been working closely with EDC and DPR to develop a plan to implement capital improvements to ferry landings at East 34*, East 62"^ East 75* and East 90* streets. Design of the terminal infrastructure began in early Calendar 2001 and the design process is anticipated for completion in Fiscal 2002, with construction scheduled to begin in Fiscal 2003. Other new initiatives address deficiencies in existing facilities, opening new areas of the waterfront to ferry service and better integrating the ferry system into New York’s intermodal transportation network.

• DOT has been working with EDC on a plan to create a new West Midtown Intermodal Ferry Terminal at Pier 79 at West 39* Street. The City Council approved a lease for the facility on November 20, 2001. EDC has hired a consultant team to design the facility and it is anticipated that construction will be bid in Fiscal 2003. The project is financed by a combination of Federal Transit Administration, Federal Highway Administration, City and private funds.

Bus Services and Emissions Control • In preparation for future Compressed Natural Gas (CNG) bus purchases, the Department is compiling design specifications for fueling facilities at two of the four bus depots that require LI f upgrades to support the CNG bus program. Installation of necessary equipment at the first facility is scheduled for completion by the end of Calendar 2002, a delay of approximately eight months due to contractual issues with the private owner of the depot. Installation of CNG equipment at the I second facility is scheduled for completion in mid-Calendar 2003. Design work for the remaining I two depots is delayed pending discussions with the bus depot operators.

80

CITY_21MC100_013395154

NYC-WTC_000245541

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000245541Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

Compare copies and versions →