NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Perry R. McNair Construction Coordination

Summary Mr. McNair has more than 20 years of experience in construction management and inspection of civil infi-astructure. Particularly important to the World Trade Center clean up effort, he has recent experience in managing the remediation of contaminated residential and commercial properties in New Jersey. Mr. McNair is expert in Occupational Safety and Health Administration (OSHA) regulations regarding safety in underground projects and has extensive knowledge of ground support requirements and installation.

Mr. McNair has organized and managed large project teams; interfaced extensively with public and private sector project participants; managed multiple contractors; and worked with clients to create a team-based environment. His ability to work with state and local environmental permitting agencies to meet critical noise, air quality, and other regulatory requirements while minimizing delays to the project has been a special asset to projects on which he has served.

Education Frederick College, Portsmouth, Virginia, 1969-1971 (No degree) Specialized Training; Hydraulics, Electricity, and Electronics, U.S. Navy, 1963-1965; various courses on drilling and blasting, hazardous materials, first aid, and contracts and claims

Professional Data Alaska General Blasters License #0058

Relevant Experience

1999 - Present Metromedia Fiber Network, Seattle, Washington. Project/Field Manager. Responsible for construction of a 300-mile fiber optic network for the client, Metromedia Fiber Network, in order to provide their customer-base with an optical Internet infrastructure. Implements fast track schedule, developing work plans and budgets. Directs application for local work permits and provides problem resolution. Manages project team including engineering, construction, project controls and administration. Establishes and maintains client relationship that will result in positive feedback and lead for potential expanded roles. Manages various construction contractors as well as supervises field engineers, inspectors and contracts manager.

1998-1999 U.S. Army Corps of Engineers Formerly Utilized Site Remedial Action Program (FUSRAP), Maywood, New Jersey. Project Superintendent. Mr. McNair managed 90 construction workers in the remediation of contaminated residential and commercial properties in New Jersey. He was the single point of contact with the property owners and various regulatory agencies, including the state and federal Environmental Protection Agencies and the Independent Verification Corporation, a

CITY_21 MCI 00_014587532

NYC-WTC_000243408

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243408Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →