NYC-WTC_000263635
Day shift daily workforce and equipment at World Trade site, Jan 24, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗Day shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
NYC-WTC_000237671OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 15145 Sth Road. Whitestone. N.Y 11357-(710)767-9000 DATE: 1/2402 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT 1 |CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 973 LOADER 1 OFFICE ENGINEER CAT 365 GRAPPLER 1 FOREMEN 1 CAT 375 GRAPPLER 2 SAFETY OFFICER 1 HITACHI 750 GRAPPLER 1 LABORERS 9 HITACHI 550 GRAPPLER IRON WORKERS HITACH11200 GRAPPLER 1 LOCAL 14 5 185 CFM COMPRESSOR 1 LOCAL 15 6 235 HAMMER HOE RAM CARPENTER MECHANICS TRUCK 2 CARPENTER FOREMAN______________________ 1 TOOLTRUCK TEAMSTERS (FUEL) 1 TOOL VAN 1 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 15 ROLL OFF MECHANICS 3 DUMP TRAILERS HOUSE WRECKERS 1 LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 DELIVERIES:_____________________ _________________ PICKUP TRUCKS 6 1 DRIVER FROM WHITESTONE (lERVASI) DELIVERED LIGHT TOWERS 5 PLATES FOR TRUCKS SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK PUMP 2 1
Description of Work:__________________________________________________ PRELIMINARY/ANTICIPATED WORK__________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER TWO MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA___________________ T77 SWITCHED FOR T71 DUE TO MECHANICAL DIFFICULTY___________ LOADS OUT 112 YUKES LOADS 100 DOT LOADS 101
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0124D.xls
CONF I DEKnECF, 2IMC10 0_0 03416045
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000237671
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000263635
Day shift daily workforce and equipment at World Trade site, Jan 24, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263578
Grace Contracting daily workforce report for World Trade Center World Trade Center job site.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342311
Day final workforce and equipment listing for World Trade, Jan 24, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305174
Day final daily workforce and equipment at World Trade site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267321
Staffing and equipment usage summary for World Trade Center project day.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356573
Daily labor and equipment listing for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356572
Daily labor/equipment roster for World Trade site, Jan 28, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237680
Night shift daily work force and equipment log for Grace Contracting Corp. at the World Trade site.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263637
Day shift daily workforce and equipment at World Trade site, Jan 25, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429414
Night shift staffing and equipment listings for World Trade Center project on 1/28/02.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305072
Daily workforce and equipment entries for World Trade Center site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305067
Daily workforce and equipment entries for World Trade Center site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000263635
Day shift daily workforce and equipment at World Trade site, Jan 24, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263578
Grace Contracting daily workforce report for World Trade Center World Trade Center job site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342311
Day final workforce and equipment listing for World Trade, Jan 24, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305174
Day final daily workforce and equipment at World Trade site, January 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267321
Staffing and equipment usage summary for World Trade Center project day.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356573
Daily labor and equipment listing for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000263635
Day shift daily workforce and equipment at World Trade site, Jan 24, 2002.
Similar indexed content
NYC-WTC_000263578
Grace Contracting daily workforce report for World Trade Center World Trade Center job site.
Similar indexed content
NYC-WTC_000342311
Day final workforce and equipment listing for World Trade, Jan 24, 2002.
Similar indexed content
NYC-WTC_000305174
Day final daily workforce and equipment at World Trade site, January 2002.
Similar indexed content
NYC-WTC_000267321
Staffing and equipment usage summary for World Trade Center project day.
Similar indexed content