The contractor shall prepare a project specific Health and Safety Program Plan that complies with State and Federal Requirements. A copy of the Health and Safety Plan shall be submitted to the Project Officer within ten (10) days following contract award.

Health and Safety Plans shall be prepared in accordance with Federal Register, ASafety and Health Program© 40 CFR 1910.120(b), and with Washington State General Occupational Health Standards, WAC 296-62-3010, Safety and Health Program.

Contractor Communication

Upon approval of the Task Order Statement of Work, the Contractor shall maintain at least weekly communication with the PC regarding the status of the work on this Task Assignment.

Inherently Government Functions

The contractor shall not perform any inherently government functions (IGF) under this Task Assignment. If during the course of developing the plan of work, through receipt of technical direction, or in carrying out the assignment, any portion of the effort is considered to possibly be an IGF, the Contractor must immediately notify the Project Officer and the Contracting Officer.

Occupational Health and Safety

Facility site visits conducted under this Task Assignment which involves on-site inspections or sampling must be conducted in full compliance with the Department of Labor Occupational Safety and Health Administration rules under 29 CFR Part 1910 and EPA Order 1440 (Occupational Health and Safety Manual).

Documents

Documents shall be prepared using WordPerfect (versions 6.1 or later) of a comparable system. Electronic media materials delivered to the Agency shall be on 1.44" disks, unless specified otherwise. All written deliverable shall, to the extent possible, be double-sided copies, and shall be delivered in reusable/recyclable envelopes.

Upon issuance of written direction the contractor shall submit for inspection copies of all work in progress at any time under this eontraet. The contractor shall develop and maintain files.

Technical Direction

Technical direction includes:

(1) Direotion to the contractor which assists the contractor in accomplishing the Statement of Work.

(2) Comments on and approval/acceptance of reports or other deliverable.

Technical direction will be issued in writing or confirmed in writing within three (3) calendar days after oral issuance. The technical direction memorandum will be provided to the Contractor and copies will be forwarded to the Contracting Officer and Project Officer. If the Contractor has not received written confirmation within three (3) calendar days of an oral issuance, the

CITY_21MC100_008824776

NYC-WTC_000234844

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000234844Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →