SUBPART 56-8 PHASE II B ASBESTOS ABATEMENT

56-8.1 Air Sampling Requirements. (a) Personal Air Sampling. Air sampling shall be performed in the worker’s breathing zone, by the asbestos contractor for his personnel, as required by current OSHA regulations.

(b) Daily Air Sampling. Project air sampling shall be conducted daily for the full workshift for Large projects. If more than one daily workshift is required to accomplish the work, air sampling shall be performed on each workshift. Air sampling is not required on days when there are no Phase II B activities.

(1) Number And Location Of Samples - Large Asbestos Projects. A minimum of five (5) samples shall be taken on a daily basis. The locations of samples to be taken are the same as specified for Phase HA. (See Section 56-7.1 and Table 2 within Section 56-4.9)

(2) Work Stoppage Criteria During Phase II B Abatement Procedures. If air samples collected outside the regulated abatement work area, indicate airborne fiber concentrations at or above 0.01 fibers per cubic centimeter, or the established background level, whichever is greater, work shall stop immediately for inspection and repair of barriers and negative air ventilation systems as necessary. Clean up of surfaces outside of the regulated abatement work area using HEPA-vacuums and wet-cleaning methods shall be performed prior to resumption of abatement activities. A summary of clean up activities and the results of barrier inspections including any necessary repairs, shall be documented in the supervisor’s daily project log. Work methods shall be altered accordingly to reduce fiber concentrations to acceptable levels.

(c) Exemption from Daily Air Sampling. Daily air sampling is not required on exterior asbestos projects with abatement of non-friable ACM roofing, siding, caulking or glazing compound, tars, sealers, coatings or other NOB ACMs, unless the ACM is rendered friable during removal or debris falls inside the building/structure.

56-8.2Access to and Maintenance of Decontamination Systems and Regulated Abatement Work Area Enclosures.

(a) Access. Entry to the personal and waste decontamination system enclosures shall be restricted to the asbestos contractors involved with the asbestos project, appropriately certified employees of the asbestos contractors, authorized visitors, police, fire and other public safety personnel.

12 NYCRR56 Subparts, Page 71

CITY_21MC100_0 03235091

NYC-WTC_000233357

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000233357Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127792 · Box DEP Box 52

NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.

Similar indexed content

Compare copies and versions →