SUBPART 56-5 PHASE lA: ASBESTOS SURVEY PLANNING AND DESIGN
56-5.1 Asbestos Survey Requirements for Building/Structure Demolition, Renovation, Remodeling and Repair
(a) Asbestos Survey Required. An owner or an owner’s agent, except the owner of one and two-family dwellings who contracts for, but does not direct or control the work, shall cause to be conducted, an asbestos survey completed by a licensed asbestos contractor using inspectors certified in compliance with Section 56-3.2(d), to determine whether or not the building or structure, or portion(s) thereof to be demolished, renovated, remodeled, or have repair work, contains ACM, PACM or asbestos material. This asbestos survey shall be completed and submitted as indicated in Subdivision (g) of this Section, prior to commencing work. All such asbestos surveys shall be conducted in conformance with the requirements of Subdivision (e) of this Section.
(b) Exemptions To Asbestos Survey Requirements: The asbestos survey required by this Subdivision (a) of this Section shall not be required for the following classes of buildings or structures:
(1) an agricultural building;
(2) buildings or structures for which original construction commenced on or after January 1, 1974;
(3) A Structure certified in writing to be structurally unsound by a licensed Professional Engineer, Registered Architect, Building Inspector, Fire Inspector or other official of competent jurisdiction. (See Section 56-11.5)
(c) Building/Structure Demolition. If a building/structure asbestos survey is not required or performed per Subdivision (b) of this Section, and the building/structure is certified to be unsound or slated for contracted demolition, the building/structure shall be assumed to contain asbestos, and shall be demolished per this Part, unless the building/structure is adequately certified to be free of asbestos containing material. Acceptable documentation for certification shall be a previous thorough building/structure asbestos survey, abatement records or other documentation acceptable to the Commissioner or his or her representative.
(d) Responsibility To Comply. No exemption to the requirement to conduct a asbestos survey shall exempt any person, asbestos contractor, property owner or business entity from the inspection or asbestos survey requirements of EPA, OSHA, and any other applicable section of this Part.
12 NYCRR56 Subpart 5, Page 41
CITY_21MC100_0 03235061
NYC-WTC_000233327
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
9 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
11 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
15 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
6 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
7 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
7 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000100489
Contractor billing statement for environmental remediation work performed at specified job sites.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163095
Notification of completed lead wipe clearance testing at 114 Liberty with results meeting EPA clearance levels; asbestos results pending.
Similarity score 0.944 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163130
Inquiry regarding written clearance letters and testing results for asbestos, lead, and silica at 114 Liberty Street.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111382
Department of Environmental Protection asbestos inspection report notification form for a facility.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111382
Department of Environmental Protection asbestos inspection report notification form for a facility.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111304
NYC DEP Asbestos Project Notification form for an inspection report submission.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
Similar indexed content
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similar indexed content
NYC-WTC_000154680
Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
Similar indexed content
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similar indexed content
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Similar indexed content