NYC 9/11 Public Portal Document
Ullmann Environmental Group Sarr^ng Data One World Financial Center
Brookfield Financial Properties
1 WORLD FINANCIAL CENTER
Sample Information Air Sampling D st lercury
Sample Number Floor Compass Location or Sample PCM (fb/cc) TEN Air TEM Air PLM(%) I Point Count TEM Bulk ASTM 5755 ASTM 5755 Lead pg/ft^
Lead
Date
Point Surface/Component Volume (struc/cc) (struc/mm) (%) (% weight) (struc/cm’)
mg/kgsppm mg/m’
11/11/01 E-57 Upper lobby partition <535
BrookniaM off Ctiicle
11/11/01 E-60 Upper lobby ______ partition 1.606
M/E/R fresh air intake/Fan
11/13X?1 MOC022 Penthouse 85.600
M/E/R fresh air intake/Fan
11/13A31 MOC02D Penthouse <4,280
M/E/R fresh air intake/Fan
11/13/01 IVIOC021 Penthouse unit mid rise 25-11 8,560
M/E/R fresh air intake/Fan
11/13/01 MOC019 Penthouse init LOper high rise 40-34 102,720
11/16A01 JP111601-13 IBS » N _________ end_________ 1440 0,0134 50.0
11/16/01 JP111601-14 Penthouse E _________ end__________ 1440 <0,0045 <16.7
11/16/01 JP111601-15 Penthouse N _________ end__________ 1440 <0.0045 <16.7
11/16/01 JP1116O1-16 Penthouse E end 1440 <0.0045 <16.7
11/28/01 LF 11/28 5 Parking lot _________ ramp_________ 1440 0.004
11/28/01 LF 11/28 6 ParWng lot _________ stairs_________ 1440 <0.002
12/24/01 K6639S Street Level AQ Storage Area 960 0.0134 33.3
01/11/02 12:05 41 W _________ Floor_________ 000
01/11/02 12:06 41 E _________ Floor_________ 000
01/11/02 11:67 NE _________ Lobby_________ 000
01/11/02 11.58 NW ________ Loto^_________ 000
01/11/02 11:59 SW ________ Lobby_________ 000
01/11/02 12:00 SE ________ Lobby_________ 000
01/11/02 12:02 Lobby by Freight 000
01/11/02 11:49 SL Loading Dock 000
01/11/02 11:47 SL ________ Lobby_________ 000
01/11/02 11:53 SL Main Enterence 000
01/11/02 11:55 SL Turner Office 000
aB Hamway tower a
RL01-01/22/D2 CokJtnn In Front of
01/22/02 1200 0.002 5
RL02-01/22/D2 AB Pathway Tower A
01/22AD2 K79396 NW Entrance to Wakway 1200 0.008 20
AH Hamway 1 ower A
RL05-01/22A)2 Column in Front of
O 01/22A)2 Pathway Entrance 1200 0.006 15
RL06-01/22A)2 AB Pathwy Tower A
01/22X)2 K7940O NW Entrance to Wakway 1200 0.002 <10
Ah Halhway lower A
RL07-01/22A32 Column In Front of
o 01/2^ Pafriway Entrance 1200 0,006 <15
m RLO8-O 1/22/02 AB Pafrtwylo^A
■0 01/22/02 NW Wakway 1200 0.007 <20
RL01-0lZ2l/0i AB Pathway T ower A
§ 01/22^2 NW
AB Pathway Tower A
1200 0.031 75
O 01/22^2
RLt)2-t)1/21/D2
K74406 NW Entrance to Wakway 1200 0.007 <20
J] AB PaTiwy I ower A
DO RL03-01/21/02 Cokmn In Front of
<10
01/22/02 -RLO4-01/21/02
— Pathway France
AB Pathway Tower A
1200 0.003
O K74408 NW Entrance to VVakway 1200 <0.002 <5
> 01/22/02
AB Hamway 1 ower A
z RL06-01/21/02 Column In Front of
z 01/22/02 K74409 Pathway Entrance 1150 0.004 <10
>
s
c
ro
1”° CA = Chrysotile Asbestos DC s During Cleaning
o NVA = No Visible Asbestos IWA = Inside Work Area
o NAD/NA= No Asbestos Detected AQ = Air Quality
o 01/1W2
o FAT = Final Air Test OWA = Outside Work Area
o
ay
co
cn
NYC-WTC_000196403
OCR can misread numbers and units. Confirm readings against the page image before using them.