NYC 9/11 Public Portal Document
World Trade Center Emergency Response Inspections at 105 Duane Street December 11, 2001 — On arrival the porter, Joe insisted that DEP return during normal working hours. He spoke to the building manager via telephone. After about 10 minutes Joe said 1 will have to return the next day. He also said that the work on the duct cleaning had stopped. December 12, 2001,10 am - on arrival I met Mr Joel Kupferman an attorney with NY Environmental Law & Justice Project and a group of tenants outside the building. They informed me that they were concerned about the air quality in the building and that they wanted the duct cleaning work to be stopped. Inspection of the 10 floor and 2"‘* floor HVAC room revealed that there was no visible suspect material. Ms Lisa Bergenty a building rep said that over 250 TEM sample taken by ATC labs were negative for ACM. She also said that the tenants have the option of requesting additional testing. Presently, they had stopped the work being performed by TECH CLEAN to address the tenants concerns. That they were also willing to treat the duct cleaning as an asbestos project. This information was relayed to the tenants and Mr Kupferman. December 12, 2001,10:15 pm - inspection was based on a request by DEP to MS Bergenty to conduct additional sampling on the lO'^ & 2"** Floor HVAC room. ATC was on site conducting aggressive TEM air monitoring. Five pumps were running on the IO*** & 2"^ floor. Results later submitted to DEP were negative for ACM. December 20, 2001 - The purpose of the visit was to determine whether any more sampling was required of the ventilation system. Present were Howard Bader - a consultant for the tenants association, two tenants were present, a representative of Tech Clean (duct cleaning company), ATC Labs rep, Lisa Bergenty of Relations Management (bldg. Mgt. Co.) a DOH - Peter Stallbohlm, Brendan Farell - Super. Some other helpers were present. I requested from Mr. Bader to take us wherever he deemed appropriate to start. The 10*** floor diffuser was chosen. On opening, we found that there was no visible dust. Bader also, used a portable monitor to check for respirable fibers and found none. It was then suggested by him that this might be the condition of all the other locations. As a result, no more inspection was necessary. I repeated to him that I would be happy to look at more. One of the tenants, who was present, wanted her apartment vent inspected. This we did and found that there was minor dust accumulation, which appeared to be very old. Bader said that he might take a sample. It was agreed that the owner would treat the clean up of the duct as though it was an ACM project. However, this is on hold because of other concerns by the tenants. DOH also agreed that there was no concern reference ACM. It was acknowledged that the owners are done more than sufficient sampling. The tenants concern was that some procedures were not being followed. Such as, the plastic covering the duct had fallen off or had holes. The tenants also had in their possession a document from EPA dated December 19, 2001, which indicated DEP methods, were inaccurate. Mr. Kupperman (tenants attorney) met me outside the building and expressed his concern that DEP protocols were incorrect based on the EPA document. Before leaving the site I again requested if there wa.s any other concerns regarding ACM and was told "no. ' Based on my inspection there was no suspect material to be sampled. The owner is still agreeing to do any more sampling required by the tenants. Also, it wa.s agreed that DEP would be notified when any duct cleaning begins. December 29, 2001 - Inspection revealed that the duct was being cleaned in the HVAC room. The riser.s have been closed off at the fan room. Workers were in PPE using HEPzX vacuum to do the cleaning. ATC w as also present conducting air monitoring. An inspection request of the vent in an apartment on the 14 floor revealed that there was no visible suspect material.
NYC-WTC_000178386
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
NYC-WTC_000178162
Report on inspections and tenant concerns regarding air quality and asbestos during duct cleaning work at a World Trade Center building.
7 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154642
Letter from DEP responding to concerns about asbestos in the building at 105 [name] following the World Trade Center collapse.
7 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156370
Field notes from September 2001 documenting inspections of buildings like 310 Church Street and 100 Church Street for debris.
7 shared non-person entities · 1 shared topics · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154565
Log of environmental inspections conducted at specific buildings near the World Trade Center on September 23, 2001.
7 shared non-person entities · 1 shared topics · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108244
Memo documenting site inspections at multiple WTC vicinity buildings on December 15, 2002, noting cleaning and sampling activities.
3 shared non-person entities · 1 shared topics · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
7 shared non-person entities · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
7 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163328
Distribution to environmental organizations, legal advocates, health agencies, unions, and academic institutions.
5 shared non-person entities · 1 shared topics · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160513
Letter responding to resident concerns about asbestos at 105 Chambers Street, confirming air sampling results met clearance standards.
5 shared non-person entities · 1 shared topics · similarity 0.897
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139101
EPA transmits revised scopes of work documents for the indoor dust cleaning and monitoring program, including cleaning SOW #7 and monitoring SOW #7.
5 shared non-person entities · 1 shared topics · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160515
Plan outlining cleaning timelines, cancellation policies, HVAC inspection deadlines, and access agreement requirements for February 2003.
4 shared non-person entities · 1 shared topics · similarity 0.895
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000156370
Field notes from September 2001 documenting inspections of buildings like 310 Church Street and 100 Church Street for debris.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154565
Log of environmental inspections conducted at specific buildings near the World Trade Center on September 23, 2001.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148621
Memo outlining DEP activities including assessment and coordination with federal agencies for street and sidewalk cleaning.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178162
Report on inspections and tenant concerns regarding air quality and asbestos during duct cleaning work at a World Trade Center building.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154642
Letter from DEP responding to concerns about asbestos in the building at 105 [name] following the World Trade Center collapse.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000178162
Report on inspections and tenant concerns regarding air quality and asbestos during duct cleaning work at a World Trade Center building.
Similar indexed content
Letter from DEP responding to concerns about asbestos in the building at 105 [name] following the World Trade Center collapse.
Similar indexed content
NYC-WTC_000156370
Field notes from September 2001 documenting inspections of buildings like 310 Church Street and 100 Church Street for debris.
Similar indexed content
Log of environmental inspections conducted at specific buildings near the World Trade Center on September 23, 2001.