NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

Draft Statement of Work for indoor dust sampling in NYC

Machine-extracted title · confidence 90%

Contractual document outlining services to collect and analyze dust samples for hazardous substances in selected New York City buildings.

NYC-WTC_000178163–000178169
Page image
Scanned page image, NYC-WTC_000178166
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Deliverables

The Contractor shall make site observation notes in the comments section provided on the COC form and in the daily field sampling log.

Reporting and Communication Requirements

The following reports shall be prepared by the contractor and distributed to the designated recipients in accordance with each specified requirement Times are specified in the calendar periods. Reports submitted under this contract shall cite the contract number in addition to identifying the Environmental Protection Agency (EPA) as the sponsoring agency

Technical Reports

Documents/reports required in the performance of contract activities shall be submitted by the contractor to the Project Officer (i e. Productivity Reports, QA/QC Reports, Weekly Project Status Reports..etc)

Healthand Safety Plans

The contractor shall prepare a project specific Health and Safety Program Plan that complies with State and Federal Requirements. A copy of the Health and Safety Plan shall be submitted to the Project Officer within ten (10) days following contract award

Health and Safety Plans shall be prepared in accordance with Federal Register, “Safety and Health Program’’ 40 CFR 1910.120(b), and with Washington State General Occupational Health Standards, WAC 296-62-3010, Safety and HealthtProgram.

Contractor Communication

Upon approval of the Task Order Statement cf Work the Contractor shall maintain at least weekly communication with the PO regarding the status of the work on this Task Assignment

Inherently Government Functions

The contractor shall not perform any inherently government functions (IGF) under this Task Assignment. If during the course of developing the plan of work, through receipt of technical direction, or in carrying out the assignment, any portion of the effort is considered to possibly be an IGF, the Contractor must immediately notify the Project Officer and the Contracting Officer

Occupational Health and Safety

Facility site visits conducted under this Task Assignment which involves on-site inspections or sampling must be conducted in full compliance with the Department of Labor Occupational Safety and Health Administration rules under 29 CFR Part 1910 and EPA Order 1440 (Occupational Health and Safety Manual).

Documents

Documents shall be prepared using WordPerfect (versions 6 1 or later) of a comparable system Electronic media materials delivered to the Agency shall be on 1 44" disks, unless specified otherwise All written deliverable shall, to the extent possible, be double-sided copies, and shall be delivered in reusable/recyclable envelopes

Upon issuance of written direction the contractor shall submit for inspection copies of all work in progress at any time under this contract The contractor shall develop and maintain files

CITY_21MC100_011836896

NYC-WTC_000178166

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000178166Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000176016

Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.

Similar indexed content

Compare copies and versions →