12 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Draft Statement of Work for indoor dust sampling in NYC
Machine-extracted title · confidence 90%Contractual document outlining services to collect and analyze dust samples for hazardous substances in selected New York City buildings.
NYC-WTC_000178163–000178169
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
TASK 2: Field Implementation Support:
The contractor shall perform all field activities utilizing the appropriate field sampling and analytical methods specified in Attachment 2
The contractor shall ensure that all personnel performing work under this task have received appropriate training
The contractor shall provide the sampling equipment necessary to perform the sampling outlined in this contract Any purchased equipment will be returned to ERA at the conclusion of this contract
The contractor personnel shall be required to have the proper site Personal Protective Equipment (PPE) for performing the work
The contractor shall provide the supplies and consumables necessary to perform the sampling (e.g sample wipes, filters etc.) and store them appropriately until use.
The contractor shall transport portable air, microvac, and wipe sampling devices to sample locations, assemble the instruments, program the instruments, perform verifications (calibration when necessary), install filters and operate the instrument to begin the sampling. The contractor shall document all the necessary information regarding sampling activities, fill out all field logs, data sheets and chain of custody forms. The contractor shall use FORMS II lite for all sample and chain of custody documentation The contractor shall remain at each site for the entire sampling event. Upon completion of the sampling event the contractor shall retrieve any stored information and/or data and record any additionalrequired/ield informa t(on.jThecoritractor shall remove and properly package ana store'the spmpjbfilte^f^lraf^^^S^'’^'i disassemble the sampling instruments The contractorshall.properly package the samples for shipment/transport to the ERA Regional-contract labofatdry specified op chain-ot-CLstody forms The contractor will provide the appropriate electronic data and hard copy data forms to the on-site ERA representative daily
The contractor will visit a total of fourteen (14) buildings for this project.
Fourteen (14) buildings will be sampled according to the table provided in Attachment 1. For each building, three units (2 residences and 1 common area) will be sampled
All work shall be completed in accordance with the Statement of Work, QAPP and all referenced sampling methods, analytical methods, SOPs and guidance attached to the QAPP No deviations from the Statement of Work, QAPP or SOPs including referenced methods, instructions, or other procedures specified, shall be made without prior receipt of alternate technical direction issued in accordance with the contract.
The contractor may be required to attend meetings or conference calls with the PO for planning and coordinating field activities.
The contractor shall perform field QA/QC related activities associated with this task, such as testing and calibration of samplers and ancillary equipment, calibrations, collocations, collection of field blanks, trip blanks, field duplicates, review of field data, entry of data into logbooks/field data sheets, preparation of chain-of-custody reports and deliverables.
The above field activities will be performed at 14 buildings in New York City
The Contractor shall record, organize, label, and file records pertaining to the contract
CITY_21MC100_011836894
NYC-WTC_000178164
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
12 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000176016
Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.
11 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162212
EPA staff distributed a chain of custody document to multiple federal and city agencies on May 15, 2002.
12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182053
Contract document outlining the scope for collecting and analyzing settled and airborne dust samples from buildings affected by Ground Zero dust.
12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178128
Contract statement of work for collecting settled and airborne dust samples in New York City buildings.
12 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140456
Contract excerpt detailing contractor responsibilities for field sampling, equipment provision, and personnel training.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000182053
Contract document outlining the scope for collecting and analyzing settled and airborne dust samples from buildings affected by Ground Zero dust.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Similar indexed content
Similar indexed content
Similar indexed content
Draft contract document outlining the scope for collecting and analyzing settled and airborne dust samples in fourteen buildings.
Similar indexed content