AREAiJEMERGENCY OPERATIONS CENTER
ITEM QTY DESCRIPTION COST
20. 3 Equipment rack, black, with vents, blank panels,
locking back door, rack shelves, fans and power
strips required to complete installation. $3,750
MIDDLE ATLANTIC MRK 44-26
ALL ACCESSORIES AS REQUIRED
21. LOT Miscellaneous hardware, switches, relays panels,
connectors, cabling, lamps, terminal blocks, wall plates, etc.,
necessajy to insure a complete and operating system. $2,500
CUSTOM BY AV CONTRACTOR
The following equipment shall be furnished by the AA^ Contractor, and installed by others:
22. LOT 1 X 4 projection screen wall, utilizing 14” acrylic screens and
P2000 framing system; all screens to provide a 54” high by 72” wide
image. ;$9,000
STEWART FILMSCREEN AEROVIEW 100
PERIMETER 2000 FRAMING SYSTEM
23. 30 Ceiling back boxes and grills for Atlas/Soundolier ceiling
speakers. $ 788
ATLAS/SOUNDOLIER E-410 ENCLOSURE
ATLAS/SOUNDOLIER 51-4 GRILLE
24. 5 Floor boxes, for raised access, carpeted, computer flooring with.
Lift off full access door and fold back cable exit. $2,469
FSR FL-540P RAISED ACCESS FLOOR BOX
25. 8 Ceiling mount brackets for 29” ceiling mounted monitors. $2.500
PIVOTELLI OR APPROVED EQUAL
26. 1 Ceiling mounted screen, with tab-tensioned system; viewing area
60” high X 80” wide, with low-voltage interface. $3,250
STEWART FILMSCREEN MODEL A
SMW #5149 11130-39 May 4, 1998 ’