NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/7DCAS/Mayor's Office of Emergency Management®System Checkout
Document / 3 pages

System checkout report for OEM at 7 World Trade Center,

Machine-extracted title · confidence 95%

Letter from technology consultants submitting findings from a system checkout for the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000172549–000172551

Folder label: “Mayor's Office of Emergency Management®System Checkout”

Page image
Scanned page image, NYC-WTC_000172551
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

•^os ot-aa 1" 15 F.u,2122190256 swanke Hayden connell 0004/004

Mayor’s Conference Room: 1. Cassette Deck “Record” Button does not latch. The deck will not stay in the record mode. 2. Video input jacks located in the rear wall plates cannot be displayed on any of the monitors. This is a routing issue, since cabling has been tested. 3. Adjust and balance Video/PC images on the Video Projecror sis well as the 6 Data Display Monitors. Images do not fiU the screens and are not centered. 4. Video Teleconference System Cameras need to be raised up from their current position CO provide a better viewing angle. ACTION; Items to be corrected by Ace AV.

PFo/Thaining Room ACTION: There are no items to be corrected.

Watch Cc»>iMANt> i» ACTION; There are no items to be corrected.

Commissioner’s Suite ACTION: There are no items to be corrected.

t

I i

Shen Milsom & Wilke, Inc.

NYC-WTC_000172551

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172551Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Value engineering memo, 7 WTC, September 1998 · Box 7DCAS

NYC-WTC_000168679

Architectural transmittal of value engineering comparison between construction change orders for 7 World Trade Center Mayor's Office emergency management space.

1 shared topics · Same agency, volume and box · similarity 0.921

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →