← Document results/7DCAS/Proposed Project Schedule;®Office of Emergency Management
Document / 1 page

Work schedule for OEM at 7 WTC, Nov 1997

Machine-extracted title · confidence 90%

Schedule document dated November 1997 outlining work phases and review dates for the Mayor's Office of Emergency Management.

NYC-WTC_000170888

Folder label: “Proposed Project Schedule;®Office of Emergency Management

Page image
Scanned page image, NYC-WTC_000170888
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Swan KE Hayden Connell Architects

Mayor's Office of Emergency Management 7 World Trade Center Date: November 11,1997

Proposed Project Schedule Nov ’97 Dec’97 Jan ’98 Feb ’98 Mar ’98 Apr ’98 May‘98

c: Silipinaiii Desisn (5 Weeks) Week Number 10/2? 11/31 ll/io| 11/17111/24 12/11 IM 112/is| IMl] 1^ 1/5 I 1/12 I 1/191 l/2d 2/2 I 2/9 I 2/l« I 2/23 3/2 I 3/9 I 3/16 I 3/23 I 3/30 3 Construction Phase (approx. 6 Months)

Program Verification & Review w/ OEM/DCAS Submit Blocking Diagrams to OEM/DCAS 11/06/97 ! | -I— I ! u h-'T- Review and Approval of Blocking Plans by OEM/DCAS 11/10/97

Incorporation of Comments —t J____ L Existing Conditions Survey & Backgrounds i 2 weeks Prepare Schematic Design Drawing/OutKn^Specs 2 weeks

Submit Schematic Plan/Outline Specs to OEM/DCAS 11/24/97 1 Review and Approval of Drawings by OEMDCAS Incorporation of Comments (Part of D.D.)

Prepare Design Development Drawings/FFE Presentation Riga Weeks

Submit to OEM/DCAS 12/19/97 -I— Review and Approval of Drawings by OEM/DCAS12/26/97 ! I Incorporation of Comments (Part of C.P.) III ( oiitraet Diiciiinent

Prepare Construction^oc^ents 8 Weeks

Submit to OEM/DCAS 02/23/98 Review and Approval by OEM/DCAS 03/02/98 fc'5 1 Week -4 2 Weeks 1 Incorporation of Comments 1—r i — File Documents for Building Permits Submit to OEM/DCAS/Owner for Final Sign - Off 03/16/98 rr Bidding

Contract Administration

1— 4 4- ■ I ZZ±1

W 5576 A OEMDocs Schediilc OEM Proposed Project Schedule 11-11-97

NYC-WTC_000170888

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000170888Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

List of drawings Addendum #1, May 1998 · Box 7DCAS

NYC-WTC_000173192

List of architectural drawings issued under Addendum #1 for the Mayor's Office of Emergency Management project.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.909

machine-extracted · confidence unavailable · Check page ↗
Addendum #1 to specifications, May 1998 · Box 7DCAS

NYC-WTC_000173205

Transmittal letter for Addendum #1 modifying project specifications and drawings for the Mayor's Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.901

machine-extracted · confidence unavailable · Check page ↗
RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.897

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →