eomponcnts and other items specified by Tenant which arc net Building standard, and/or are-not
readily-available to Landterd or Landlord's designated contractor, or require special
manufacturing, fabrication or installation, er-require additienal-timc to obtain or install thereby
delaying-thc date that-Tenant's Initial Work ■weuld-ndierwisc-be substantially conyleted,-including
but not Hmited-te, special wall coverings, light fixtures, entrance doors,-woodwork, glass.
stairways,-door hardware-, -floorcoverings-and-security and eemmunieations deviccs. Landlord
shall not be responsible for any of the delays set forthin-this-Article. and; at. At Landlord's
option, the term Term of this Lease shall commence three <3) business days after gn the date on
which Tenant's Initial Work of the general office potion of the Demised Premises would have
been substantially completed Substantially Completed if not for the occurrence of any such 0
lays. ** 0.5^
(I) Notwithstanding anything contained to the contrary in this Lease, the total cost of V—
Tenant's Initial Work which Landlord shall provide Tenant without charge and for installations
performed prior to the Commencement Date shall be TWO MILLK^SIXTY-QNE THOUSAND
SIX HUNDRED SEVENTY-FIVE and 00;i0a ($-2,061,675.00) DOLLARS (the
^-ap='> ,(1_____________ ) DOLLARSdthe "Landlord’s j
TuWi Contribution").* If the Work Cost shall exceed the Cap Landlord’s Maximum
Maximum
Contribution. Tenant may accept Landlord's detailed estimate of such excess cost (including anv
resulting delay) only by countersigning and delivering same to Landlord within three (3) days
after Landlord's rendition of such estimate. If the Work Cost shall exceed
V'
Tenant shaft-Landlord’s. Contribution, anv a rnw. Jif
1 (the “Cap”) will be paid bv Tenant. If the Work Cost exceeds the Cap.
26