107.30 FEET;
4. THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OP 102 DEGREES 16
MINUTES 18 SECONDS ON ITS NORTHERLY SIDE WITH THE PRECEDING COURSE,
41.79 FEET;
5. THENCE NORTHERLY ALONG A LINE FORMING AN ANGLE OP 80 DEGREES 58
MINUTES 45 SECONDS ON ITS EASTERLY SIDE WITH THE PRECEDING COURSE,
50.75 FEET;
6. THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OP 90 DEGREES 05
MINUTES 24 SECONDS ON ITS SOUTHERLY SIDE WITH TSE PRECEDING COURSE,
102.08 FEET;
7. THENCE SOUTHERLY ALONG A LINE FORMING AN ANGLE OF 89 DEGREES 56
MINUTES 38 SECONDS OK ITS EASTERLY SIDE WITH THE PRECEDING COURSE, 7.58
FEET;
8. THENCE WESTERLY ALONG A LINE FORMING AN ANGLE OP 90 DECREES 01
MINUTES 48 SECONDS ON ITS NORTHERLY SIDE WITH THE PRECEDING COURSE,
18.98 FEET;
9. THENCE STILL WESTERLY ALONG A LINE FORMING AN ANGLE OP 160 DEGREES
20 MINUTES 05 SECONDS ON ITS SOUTHERLY SIDE WITH PRECEDING COURSE,
20.27 FEET TO TBE POINT OR PLACE OF BEGINNING.
EXCLUDING THAT VOLUME OF SPACE THEREIN NECESSARY FOR SUPPORT AND
FOUNDATIONS TO SUPPORT THE BUILDING.
ELEVATIONS ARE ACTUAL AND REFER TO DATUM OSED BY TBE TOPOGRAPHICAL
BUREAU, BOROUGH OF MANBATTAN, WHICH IS 2.75 FER ABOVE NATIONAL
CBOOETIC SURVEY VERTICAL DATUM OP 1929 (UNITED STATE COSTS AND GEODETIC
SURVEY DATUM) MEAN SEA LEVEL, SANOBOOS, NEW JERSEY.
BEARINGS ARE IN THE SYSTEM USED ON THE BOROUGH SURVEY, BOROOGB
PRESIDENT'S OFFICE, MANHATTAN.
EXCLUSION FROM PEE AREA
RIGHTS IN ELECTRICAL SOB-STATION VAULT AREA
ALSO EXCEPTING THEREFROM THE FOLLOWING DESCRIBED PREMISES ALREADY
LEASED TO CON EDISON BY TBS PORT AOTBORITY OP KEN YORK AMD NEW JERSEY.
AS MORS PARTICULARLY BOUNDED ANO DESCRIBED AS FOLLOWS;
ALL THAT PORTION OP TBE BELOW DESCRIBED PARCEL LYING BELOW A HORXZONTJ
PLANS DRAWN AT ELEVATION 54.90,BOUNDED AND DESCRIBED AS FOLLOWSt
BEGINNING AT TBX CORNER FORMED BY THE INTER8BCTX0II OP TBS EASTERLY LU
NYC-WTC_000169484
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000169484Source: NYC Law Department, mirrored locally