← Document results/7DCAS/7 World Trade Center Mayor's Office of Emergency Management- 1st, 7th, & 23rd Floors Change Order #15
Document / 1 page

Change Order #15 wall sleeves, 7 WTC, Oct 1998

Machine-extracted title · confidence 95%

Change Order #15 submitted for wall sleeve installation at the 23rd floor of 7 World Trade Center dated October 12, 1998.

NYC-WTC_000168649

Folder label: “7 World Trade Center Mayor's Office of Emergency Management- 1st, 7th, & 23rd Floors Change Order #15

Page image
Scanned page image, NYC-WTC_000168649
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Silverstein Properties, Inc. 1 r World Trade Center New York, N.Y. 10048 fetephone. 212-619-6569 October 12, 1998 fax 212-732-5190

Mr. Glenn Pymento Department of City Wide Administrative Services Division of Real Estate Services 1 Centre Street, DRES - Room 2000 North New York, New York 10007 RE: 7 World Trade Center Mayor's Office of Emergency Management-V, 7“*, & 23''' Floors Change Order #15_____________

Dear Mr. Pymento:

Attached please find change order #15 in the amount of $21,234.00 submitted by Ambassador Construction for the following scope of work.

The following is the breakdown, (as per Swanke Hayden Connell's sketch) for new sleeve location at 23™ Floor:

- (41) 4" through wall sleeves @ $283.38 $11,619.00 - (4) 2" underfloor sleeves @ $141.00 $ 564.00 - 4" stubs from ceiling to below raised floor at $ 2,537.00 15 feet of conduit with elbows 15X4 = 60' x $42.29 - Carpenter's time for cutting, patching, and fire stopping of wall $ 3,100.00 -Cutting of raised floor panel $ 500.00 Sub-total $18,320.00 General Conditions $ 1,465.00 Overhead & Fee $ 1,187.00 Insurance $ 262.00 Total $21,234.00

If this meets with your approval, please sign and return to my office.

Thank you. Sincerely,

Walter J. Vi^ems III Building Manager

cc: Cathy Giliberti Chi Chu Bill Dacunto Richard Ramos (DCAS) Josep Domingvez (DCAS)

NYC-WTC_000168649

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168649Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #15 for wall sleeves at 7 WTC, Oct · Box 7DCAS

NYC-WTC_000173643

Letter submitting Change Order #15 for the installation of new sleeve locations on the 23rd floor to support cabling at 7 World Trade Center.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗
Change Order #21 transmittal, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000173818

Letter submitting Change Order #21 for structural work at the water tank and switch gear areas on the 7th floor of 7 World Trade Center.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.974

machine-extracted · confidence unavailable · Check page ↗
Memo submitting Change Order #45, Dec 1998 · Box 7DCAS

NYC-WTC_000171891

Letter submitting Change Order #45 for furnishing and installing unspecified items at the Mayor's Office of Emergency Management.

5 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173643 · Box 7DCAS

Letter submitting Change Order #15 for the installation of new sleeve locations on the 23rd floor to support cabling at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168557 · Box 7DCAS

Memo submitting Change Order #47 for furnishing stainless steel flexes for generators at 7 World Trade Center due to height restrictions.

Similar indexed content

NYC-WTC_000171881 · Box 7DCAS

Letter submitting Change Order #47 for stainless steel generator flexes to address height restrictions at 7 World Trade Center.

Similar indexed content

NYC-WTC_000173824 · Box 7DCAS

Letter submitting a revised Change Order #17 adjusting costs for combination floor boxes at 7 World Trade Center.

Similar indexed content

Compare copies and versions →