DEPT OF GENERAL SERVICES AGENCY; Office of Emergency Management CURRENI 100 Church St, 20th Floor SPAC S ANALYST: S. Lee Wright
SPACE DESIGN-PROGRAMMING DIVISION: (OEM) ADDRESS: New York, NY 10007 lA/Jefferson
SPACE ANALYSIS BY UNIT PROGRAM: UNIT ’ERSONNEL TOTAL INCLUSIVE
PROJECT#: 96-1346 UNIT (S) Back-Up Systems PERS )NNEL w/CIRC. CaqkSqJFL
DATE: 7/15/97 CW
PAGE 3 OF 3 UNIT CODE: C UNE GRAND TOTAL / I2,l7^^C>rp.Sq.Ft
uirements as depicted on this page are based upon earlier information provided by the Agency to the RBA consultant All information is to be ch ified and confirmed. ■ a?
COMMON & EQUIPMENT AREAS
I
2 Satellite Diahei;
occ S.F. TOT.
1
COMMON & EQUIPMENT AREAS
500 500
occ. S.F. TOT.
E
COMMON* EQUIP 1ENT AREAS
Parking Requiremnts > < '■
*Parking requirements will be accomodated by DOTpermits.
occur. S.F. TOT.
•Weather Service Down Link I
1.2 meter dish
•FEMA Connections I
J Aateaaai; 25
Motorloa designed specifications w/ agency
3 • Agency to clarify and confiim all requirements.
S Lower,Floorfe&.g..; - . ~ 1 City Owned Sedans 10
Possible sftece on 3rd flootof WTC7 City Owned 4x4 vehicles 5
UPS system( Uninterrupted Power Supply) 1 1000 Private Sedans 3
8 Fuel Storage! 2 tanks @ 25,000 gallons ch 2 430
9 Waler Storage) 1 tank @ 45,000 gallons I 850 TOTLA SPACES REQUIRED 18
10 Mechanical Room to include:
II Condensers( 10 ton each) 12 360
12 Generators 2 300
13
13
IS
16
17
18
19
20
21
23
23
2S
26
27
28
29
30
31
32
33 20 0 30 0
SUB TOTAL 9,130 SUB TOTAL