A. General and Base Building Sur\'ey (M/Z/N): Tliis section is to be filled out by the space
coordinator once for the cniu-c Group requesting the move. Please read the instructions on the
cover page of this section.
B. Lease Background Survey (M/Z): This section is to be filled out once by die space
coordinator if all units arc under the same lease. If the units arc in diffcreni locations, please fill
out one lease background survey per location. Please read the cover page of this section.
C. Space Requirement Survey (M/Z/N): This section is to be filled out bv each unit. Make
copies of this part of the qucstionairc and distribute to each unit. Keep a blank copy
for yourself before distribution. The space coordinator should review the answered qucstionairc
and make the corrections, if any, before submission.
/ iv- $
Please return all original copies with the approvals of the Deputy Commissioner and the Space
Coordinator as requested.
\
NYC-WTC_000168250
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000168250Source: NYC Law Department, mirrored locally
Cover letter submitting copies of the Notice of Intent to Acquire space and attachments for the Mayor's Office of Emergency Management at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.930
Comprehensive FAQ addressing downtown building access, reopening areas, property manager contact procedures, and building damage status in lower Manhattan.