GENERAL AND BASE BUILDING SURVEY
DCS
FOR MOVES, EXPANSIONS AND NEW NEEDS WZIN
12. Is an HVAC room required? Yes __
If yes. indicate:
Sice: To Be determined as part of the overall construct 1 OU and
Equipment: engineering design______________________ __
Preferred location: within the unit
Special Requirements:
13. Are there any other issues affecting base building space needs? Yes XX No__
If yes, list and explain:
Back-up generator(s) to supply the EOC, basic electrical recrui rAmAn-hg
and a dedicated elevator. This would regn 1 r A -fnol e-t-r\T-a,jQ
Budding Fom I^Z/N - Jutr . 5
NYC-WTC_000168259
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000168259Source: NYC Law Department, mirrored locally
Cover letter submitting copies of the Notice of Intent to Acquire space and attachments for the Mayor's Office of Emergency Management at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.930
Comprehensive FAQ addressing downtown building access, reopening areas, property manager contact procedures, and building damage status in lower Manhattan.
A detailed space analysis sheet dated October 1997 listing personnel counts and square footage for various units at the Office of Emergency Management.