Proposal for MEP engineering services dated May 6, 1992

Machine-extracted title · confidence 90%

Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.

NYC-WTC_000166571–000166697

Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates

Page image
Scanned page image, NYC-WTC_000166646
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

VII. Compensation and Reimbursable Expenses TKLP

Cost Proposal Notes

1. We have allowed for 30 meetings during all the MEP design phases for base building and fitout. There are seven meetings for base building and 23 for fitout. 2. We have valued for four presentations during MEP design. These will be attended by two TKLP representatives each. We have split the cost into one presentation for base building, three for fitout. 3. We have allowed for four TKLP representatives to attend the two reliability analyses. Each will last two days; one will occur during the design development phase and the other during the contract document phase. This effort is assigned to fitout. 4. We have allowed for five trips to witness factory tests. This is assigned to fitout. 5. EXiring the construction administration phase, we have allowed for two representa­ tives to attend each of four pre-bid meetings. We apportioned the meetmgs as follows: one for base building and three for fitout. 6. We have valued for two representatives to attend weekly construction meetings dur­ ing the construction administration phase. These are apportioned as follows: 25% to base building, 75% to fitout. 7. We have allowed for four TKLP representatives to witness site testing for four days. This is mcluded m the fitout portion. 8. We have allowed for four TKLP representatives to perform punchlisting and verify completion of punchlisting. This is apportioned as follows: 25% to base buildmg, 75% to fitout. 9. Reproduction mcludes two sets each of copies and prints for tenant, owner, BBA and FA&ID review, plus one set of reproducibles at completion of each phase. 10. We have not valued for printing and copying for bidding. 11. We suggest that the first two-day reliability session be done at the conclusion of the schematic phase and that the second two-day reliability session be held at the conclu­ sion of the design development pheise, thereby shifting both forward by one phase. By doing this, the results of the reliability sessions could be included in the bid packages for the early purchased equipment and to the bid documents. The way they are pres­ ently organized, the bid documents will be completed prior to the reliability; and any­ thing developed in the reliability will result in changes and delays to the project. Any changes that are developed in relation to the early purchased equipment may m fact not be able to be achiev^ without considerable extra cost. This is because by the time this is run, the equipment could be in production.

Forest City Tech Place Associates for Full Engineering Services 05/06/92 [P237] VII-4

NYC-WTC_000166646

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166646Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →