NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
NYC-WTC_000165900–000165926
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
MONITORING EQUIPMENT: Specify by task, indicate type as necessary. Attach additional sheets as necessary.
INSTRUMENT TASK ACTION LEVELS
Photoionization Detector ()1 (x)2 Parameter: Total Volatile Organics (x)3 Type: Thermo OVM Model 580B PPL () 11.7 eV lamp Level At Concentration () 10.2 eV lamp D Background - 5.0 ppm (x) 10.6 eV lamp C 5.0 ppm to 50 ppm above background B 50 - 500 ppm above background ( ) Not needed
COMMENTS: All JWC field personnel are routinely trained and possess extensive experience in the calibration and proper use of the PID, which will be used at the site. The PID will be calibrated at the start of each workday on-site with the calibration results recorded in the field book. The Thermo OVM Model 580B was factory calibrated in November 1999.
Instrument to be calibrated to Action levels must be sustained for 15 minutes at the breathing zone to justify implementing specific PPL. The above action levels only apply if types of contaminants are unknown. If contaminants are known, contaminant-specific exposure data will be used to determine action levels. Background to TLV for specific compound will justify use of Level D PPL. TLV to compound-specific STEL or 3 x TLV will justify use of Level D PPL for 15 minutes only. If concentrations between TLV and STEL/3 x TLV are maintained for greater than 15 minutes. Level C will be implemented. Level B action levels will be determined on a project-specific basis. Project manager will be notified of any upgrade of PPL.
TASK ACTION LEVELS Flame Ionization Detector ()1 ()2 Parameter: Total Volatile Organics ()3 Type: OVA PPE Level At Concentration D Background - 5.0 ppm C 5.0 ppm to 50 ppm above background B 50 - 500 ppm above background
(x) Not needed
COMMENTS: Action levels must be sustained for 15 minutes at the breathing zone to justify implementing specific PPL. The above action levels only apply if types of contaminants are unknown. If contaminants are known, contaminant-specific exposure data will be used to determine action levels. Background to TLV for specific compound will justify use of Level D PPL. TLV to compound-specific STEL or 3 X TLV will justify use of Level D PPL for 15 minutes only. If concentrations between TLV and STRL or 3 x TLV are maintained for greater than 15 minutes, Level C will be implemented. Level B action levels will be determined on a project-specific basis. Project manager will be notified of any upgrade of PPL.
TASK Detector Tubes 01 02 Contaminant TLV STEL Tube Type ()3 Type: Draeger
(x) Not needed
7 WTC HASP 9
NYC-WTC_000165909
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
12 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
8 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
11 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
5 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer