Document / 9 pages
WTC project engineering sketch or diagram fragment Machine-extracted title · confidence 85% Technical drawing or schematic fragment related to the World Trade Center Dey Street underpass infrastructure.
NYC-WTC_000165561–000165569 Folder label: “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)”
Save to case Cite this page ↗
More like this page Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Asbestos and lead survey report cover, 130 Cedar Street, July · page 309 · Box DEP Box 50 NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.907 (not a probability)
Bulk dust sample results letter, 130 Cedar Street, Dec 2004 · page 41 · Box DEP Box 50 NYC-WTC_000125526
Letter reporting bulk dust sample results confirming the presence of asbestos-containing materials at 130 Cedar Street.
Similarity score 0.900 (not a probability)
Cover sheet for asbestos analysis transmission, June 2002 · page 3 · Box DEP Box 49 NYC-WTC_000122400
Transmittal cover sheet accompanying laboratory results for asbestos fiber analysis at the 265 Broadway project site.
Similarity score 0.900 (not a probability)
Air monitoring chain-of-custody form, 30 West Broadway, Sep 2002 · page 2 · Box DEP Box 39 NYC-WTC_000109936
Chain-of-custody log for air samples collected at 30 West Broadway on September 18, 2002.
Similarity score 0.900 (not a probability)
Asbestos and lead survey report cover, 130 Cedar Street, July · page 310 · Box DEP Box 50 NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.896 (not a probability)
Bulk dust sample results letter, 130 Cedar Street, Dec 2004 · page 44 · Box DEP Box 50 NYC-WTC_000125526
Letter reporting bulk dust sample results confirming the presence of asbestos-containing materials at 130 Cedar Street.
Similarity score 0.896 (not a probability)