Document / 14 pages
Hydraulic proportion charts for WTC sewer design
Machine-extracted title · confidence 90%Technical diagrams and tables showing proportions of value when flowing full for sewer design calculations related to the WTC project.
NYC-WTC_000165522–000165535Folder label: “P.A WTC C-81, DEY St. Replacement Sewer (WTC-DEY ST UNDERPASS)”
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Contact list excerpt, DEP Box 08, undated · page 6 · Box DEP Box 08NYC-WTC_000146785
Fragmented contact information from a Department of Environmental Protection file regarding World Trade Center environmental records.
Similarity score 0.956 (not a probability)
Hardware proposal fax cover, Secure Door & Hardware, May 1998 · page 3 · Box 7DCASNYC-WTC_000172660
Fax cover sheet from Secure Door & Hardware Inc. regarding a proposal for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similarity score 0.953 (not a probability)
Illegible document page, 7 World Trade Center, July 1997 · page 1 · Box 7DCASNYC-WTC_000170694
Unreadable text on a single page from the 7 World Trade Center lease negotiation files.
Similarity score 0.953 (not a probability)
Illegible document page with technical notes, 1998 · page 2 · Box 7DCASNYC-WTC_000172089
Page containing illegible text or symbols from a 1998 record.
Similarity score 0.953 (not a probability)
Space design and programming questionnaire instructions, undated · page 24 · Box 7DCASNYC-WTC_000168249
Instructional page for space design and programming questionnaires regarding lease background and space requirements.
Similarity score 0.951 (not a probability)
Chain of custody for bulk sampling at 395 South End · page 18 · Box DEP Box 48NYC-WTC_000121516
Document tracking environmental samples collected from Building #600 at 395 South End Avenue on January 2, 2002.
Similarity score 0.951 (not a probability)