14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗E-mails 2003 M. Gilsenan
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000162906–000162918
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
(4) The asbestos contractor shall provide sufficient equipment and experienced personnel to complete work area preparation and cleaning activities of the building interiors within three (3) weeks. At least one asbestos supervisor shall be present per work area during the duration of the clean-up activities. Work shall be performed 24 hours per day, seven (7) days per week.
(5) Water/electrical supply shall be provided by residents/owner.
(6) Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this clean-up activity. (7) Warning signs shall be posted at the approach to each work area. (8) A separate worker and waste decontamination enclosure system in compliance with Title 15, Chapter 1 of the RCNY shall be installed at the entrance to each work area. More than one work area may be established. Work shall proceed fi-om the 12* floor down to the first floor. The use of a remote decontamination enclosure system is acceptable. Prior approval must be received fi-om the NYCDEP for decontamination enclosure system placement and phasing of clean-up activities, if required. (9) An entry/exit log in compliance with the requirements set forth in Title 15, Chapter 1 of the RCNY shall be maintained in the clean room. The site supervisor shall maintain an activity log. (10) Initially, the interior of the elevator shaft, including the top of the elevator car and the elevator pit, shall be HEPA vacuumed and wet wiped to allow for the use of the elevator during the clean up. Once the clean up throughout the building is complete, the elevator shaft, including the top of the elevator car and the elevator pit, shall be re-cleaned prior to clearance air monitoring.
(Il) Isolation barrier locations (i.e.: wall or ceiling penetrations, windows, vents, doors, etc.) shall be HEPA vacuumed and wet wiped prior to installing two-layers of 6-mil polyethylene sheeting and sealed with tape. Window wells, ledges, guards, etc., that are accessible fi-om the interior shall be cleaned. (12) Negative pressure ventilation equipment (air filtration devices -AFDs) shall be installed and operated continuously 24 hours per day during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 15 minutes shall be provided. When ducting to the outside is not possible, a second negative air unit compatible with the primary unit may be coimected in series. (13) Dropped ceilings at functional air plenums shall be removed. Interior and perimeter walls shall be removed to access the interstitial spaces for cleaning. Only one side of each wall shall be removed to access the space. The back of walls scheduled to remain (i.e. tiled bathroom walls) shall be wet wiped and HEPA-vacuumed. For specific information regarding walls to be removed, please refer to the plans. Dust suppression techniques shall be used to minimize the generation of visible dust emissions. (14) The HVAC Systems and associated ductwork shall be removed and disposed in accordance with applicable rules and regulations. Intake/discharge registers of kitchen/bathroom exhaust systems shall be removed and cleaned. The first one to three feet of ductwork shall be wet wiped and HEPA vacuumed, then the registers will be reinstalled and covered with a layer of 6-mil polyethylene sheeting. 2 of 5 2/7/03
NYC-WTC_000162908
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100690
Permit application for a licensed asbestos contractor to clean interior dust at the unoccupied 114 Liberty Street building.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102620
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102605
Scope of work document dated February 2003 detailing a mandatory pre-bid meeting and requirements for asbestos abatement contractor cleaning at 114 Liberty Street.
14 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155174
Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
14 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
14 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 3 pages · confidence 0.15 · verify page 2
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162712
Official notice instructing staff to preserve scanned World Trade Center documents as potential evidence in future legal actions.
Filed in the same folder
NYC-WTC_000162713
Official notice instructing staff not to dispose of original World Trade Center documents as they are required for legal proceedings.
Filed in the same folder
Filed in the same folder
NYC-WTC_000162729
DEP submits OSHA compliance justification document for review regarding worker safety in WTC cleanup procedures.
Filed in the same folder
NYC-WTC_000162731
EPA submits detailed technical questions and comments on proposed HVAC cleaning procedures for WTC buildings.
Filed in the same folder