NYC-WTC_000135730
List of exterior addresses in Zone 1 with associated tracking numbers and inspection dates from June to September 2002.
1 shared topics · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗Contractor submits apartment log and cost data requested for WTC cleanup project.
NYC-WTC_000162755–000162770Folder label: “E-mails 2003 M. Gilsenan”

OCR status: junk · source: pdftotext
z z o o ckltIno. ScopeBi Amount i 1^ Date Address Apt No Studio 1 Brm 2 Brm toft 3 Brm 4 Brm Common Space 1stl.OOOsf Add l.OOOsf Elevator Scope A 2ars&Shaft AFDYes afdno Total co
■D o 350 1/8/2003 66 Frankfurt Street 5 1000 380 X $ 1,054.00 $ 475,3 ll-70‘ c o CT o 351 1/8/2003 66 Frankfurt Street 6 1000 380 X $ 1,054.00 $ 476,365.70 o' (33 K3 352 1/8/2003 66 Frankfurt Street Lobby 1000 40 X $ 782.00 $ 477,147.70 ■D o <33 353 1/8/2003 66 Frankfurt Street Elevators 50 X $ 55.00 $ 477,202.70 3. cn 03 354 1/8/2003 66 Frankfurt Street Roof 360 X $ 270.00 $ 477,472.70 o 4 “300 o 355 1/9/2003 12 John Street X $ 1,173.00 $ 478,645.70 o c 356 1/9/2003 77 Fulton Street 21M 742 X $ 1,500.00 $ 480,145.70 3 CD 357 1/9/2003 299 Pearl Street 2 ” 1000 1025 X $ 1,570.00 $ 481,715.70 358 1/9/2003 299 Pearl Street 3 “ 1000 1025 X $ 1,570.00 $ 483,285.70 359 1/9/2003 299 Pearl Street 4 1000 1025 X $ 1,570.00 $ 484,855.70 360 1/9/2003 299 Pearl Street 5 1000 1025 X $ 1,570.00 $ 486,425.70 361 1/9/2003 299 Pearl Street 6 1000 1025 X $ 1,570.00 $ 487,995.70 362 1/9/2003 299 Pearl Street Lobby 1000 1345 X $ 1,826.00 $ 489,821.70 363 1/9/2003 299 Pearl Street Elevators 50 X $ 55.00 $ 489,876.70 364 1/9/2003 299 Pearl Street Roof 360 X $ 270.00 $ 490,146.70 365 1/10/2003 77 Fulton Street “si 731 X $ 1,500.00 $ 491,646.70 366 1/10/2003 77 Fulton Street 7B ” 731 X $ 1,500.00 $ 493,146.70 367 1/10/2003 77 Fulton Street 14L 920 X $ 1,700.00 $ 494,846.70 368 1/10/2003 77 Fulton Street 22E 735 X $ 1,500.00 $ 496,346.70 369 1/10/2003 77 Fulton Street 16C 908 X $ 1,700.00 $ 498,046.70 370 1/10/2003 100 Beekman Street 15K 941 X $ 1,700.00 $ 499,746.70 371 1/13/2003 77 Fulton Street 21D 958 X $ 1,700.00 $ 501,446.70 372 1/13/2003 77 Fulton Street 21H 740 X $ 1,500.00 $ 502,946.70 373 1/13/2003 77 Fulton Street 22L 958 X $ 1,700.00 $ 504,646.70 374 1/13/2003 64 Fulton Street 7O1/7O(" 761 X X $ 1,500.00 $ 506,146.70 375 1/13/2003 90 Gold Street HE 740 X $ 2,426.00 $ 508,572.70 376 1/13/2003 90 Beekman Street 4A 1077 X X $ 2,145.00 $ 510,717.70 377 1/13/2003 90 Gold Street Roof 250 X $ 187.50 $ 510,905.20 378 1/13/2003 90 Gold Street 24 1000 200 X $ 910.00 $ 511,815.20 379 1/13/2003 90 Gold Street 25 1000 200 X $ 910.00 $ 512,725.20 380 1/13/2003 90 Gold Street 26 1000 200 X $ 910.00 $ 513,635.20 381 1/13/2003 90 Gold Street 27 1000 200 X $ 910.00 $ 514,545.20 382 $ 514,545.20 383 $ 514,545.20 384 $ 514,545.20 385 $ 514,545.20 386 $ 514,545.20 387 $ 514,545.20 388 $ 514,545.20 389 $ 514,545.20
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000135730
List of exterior addresses in Zone 1 with associated tracking numbers and inspection dates from June to September 2002.
1 shared topics · similarity 0.884
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135169
Status report from Kiss Construction Inc. detailing apartment cleaning and testing numbers by bedroom count as of February 24, 2003.
45 shared non-person entities · 1 shared topics · similarity 0.879
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156510
Report listing building addresses and asbestos cleanup status reported to the DEP in February 2002.
9 shared non-person entities · 1 shared topics · similarity 0.875
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156462
List of building addresses with asbestos re-inspection results received by the DEP in early 2002.
1 shared non-person entities · 1 shared topics · similarity 0.874
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138501
Forwarded communication from environmental contractor regarding requested documentation and materials for 114 Liberty project.
1 shared topics · similarity 0.872
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135727
List of exterior addresses in Zone 1 with associated tracking numbers and inspection dates from June to August 2002.
1 shared topics · similarity 0.871
machine-extracted · confidence unavailable · Check page ↗1 shared topics · similarity 0.868
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156641
Internal memorandum dated April 15, 2002 addressed to the Assistant Commissioner regarding environmental compliance actions.
2 shared non-person entities · 1 shared topics · similarity 0.864
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170956
Project timeline for Office of Emergency Management lease negotiations and execution at DDC-3 site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗8 shared non-person entities · 1 shared topics · similarity 0.862
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · similarity 0.859
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156502
List of building addresses alongside their former names or alternative designations for the WTC area.
9 shared non-person entities · 1 shared topics · similarity 0.859
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000162712
Official notice instructing staff to preserve scanned World Trade Center documents as potential evidence in future legal actions.
Filed in the same folder
NYC-WTC_000162713
Official notice instructing staff not to dispose of original World Trade Center documents as they are required for legal proceedings.
Filed in the same folder
Filed in the same folder
NYC-WTC_000162729
DEP submits OSHA compliance justification document for review regarding worker safety in WTC cleanup procedures.
Filed in the same folder
NYC-WTC_000162731
EPA submits detailed technical questions and comments on proposed HVAC cleaning procedures for WTC buildings.
Filed in the same folder