NYC 9/11 Public Portal Document
LABORATORIES, INC
AIR SAMPLE ANALYSIS REPORT
PHASE CONTRAST MICROSCOPY
CLIENT: WARREN & PANZER ENGINEERS, P.C. TURNAROUND TIME 24HRS
WKP FILE # 501-01 SAMPLE DATE 4/23/02
WKP LOG I.D. # N0204198, N0204199, and N0204200 RECEIVED DATE 4/23/02
Contract #: WTC AR2 ANALYSIS DATE 4/23/02
REPORT DATE 4/24/02
CLIENT JOB: NYC Department of Environmental Protection
CLIENT JOB #: 1079.01.01
LOCATION S.W. Area/ Site Map
ANALYSIS: AIRBORNE FIBER COUNTING, PHASE CONTRAST MICROSCOPY, NIOSH 7400. NIOSH PAT Lab NO. 07186; NY
COLLECTION DEVICE: 25 mm MCE Filter Cassette; Collection Area = 385 sq mm;
SAMPLE WERE COLLECTED BY: Benny Giambnone, J. Garcia, and Edman Dibra
SUMMARY OF ANALYSIS
CLIENT FIBERS/ FIBERS/
SAMPLE# Site# SAMPLE LOCATION Vol. sq mm cc
1079.01.01 001 27 Gateway Plaza Park Area 675 0.00 <0.004
002 31 South End Ave. and Albany Street 675 0.00 <0.004
003 32 West Street and Albany Place 675 0.60 <0.004
004 33A Rector Place by the Park Place 675 0.00 <0.004
005 34 W. Thames Street - Along Waterfront 675 0.00 <0.004
006 37 West of Third Place 675 0.60 <0.004
007 8 West Street and Warren Street 675 1.30 <0.004
008 4 River Terrace and Chambers Street 675 0.00 <0.004
009 6A River Terrace Park Area Between Park Place and Warren Street 675 0.60 <0.004
010 9 River Terrace and Park Place West 675 0.00 <0.004
Oil 17 River Terrace and Vesey 675 0.00 <0.004
012 7 Warren Street and North End Avenue 675 0.00 <0.004
013 10 North End Avenue Park place West 675 0.00 <0.004
014 29 Trinity Place and Thames Street 675 1.30 <0.004
015 21 Fulton and Church Street 675 0.60 <0.004
016 20A Vesey Street and West Broadway 675 2.50 <0.004
017 16 Park place and Church Street 675 0.00 <0.004
018 12 Murray Street and Church Street 675 0.00 <0.004
019 15 Park Place and Greenwich Street 675 0.00 <0.004
020 11 Murray Street and Greenwich Street 675 0.60 <0.004
021 Field Blank 0.00
022 Field Blank 0.00
NOTES: 1.5.5 fibers/100 fields was used to ca
2. Samples were not collected by WKP Laboratories, Inc.
3. The Federal EPA Clearance Critical following an asbestos abatement project is 0.010 fibers/cc.
4. PCM air samples will be disposed of after 3 months unless otherwise directed by client in writing.
Chris Pepino
LABORATORY ANALYST LABORATORY DIRECTOR
NYC-WTC_000161797
OCR can misread numbers and units. Confirm readings against the page image before using them.