NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 41/Requests 2012
Document / 31 pages

Subcontractor services letter for DEP, February 2012

Machine-extracted title · confidence 95%

Letter regarding subcontractor services for a water tunnel project dated February 27, 2012.

NYC-WTC_000159316–000159346

Folder label: “Requests 2012

Page image
Scanned page image, NYC-WTC_000159324
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ij01^^W^^g^TOOFNEWiYOBKJiSUBCONTRACTQRiARRROVAL^EORMWgmgtB?S^e^

Agency: DEP Unit/Div: BEDC FMS Contract No.; 82620060020284 PINl p«

III Contract Value: $7,372,760 Registration Date; 01/10/2006 ^<1 Contract Number / Description: EE-GEO-02 & EE-GEO-03 Geotechnical Engineering Services (or Water Tunnel Construction________ Contract Subject to a' Project Labor Agreement (PLA) □

Ii Name: Jenny/BAC Killam, A Joint Venture Phone: 973-379-6699__________________ Address: 475 Park Avenue South, 10'^ Floor EIN/SSN; Pil Fax: 913-379-6774 City: New York E-Mail: [email protected] State/Zip: NY 10016

mWWl»Wi^S^Wfi^«aCHi!^B!S!asSUBCONTRA<n:ORINFORMATIOWWKW^S^g^We«a»B»m<^ Co. Name: Galyn Rippentrop Co. Representative (Please Print): Phone: (812) 431-8364 Fax: (605) 339-0986 Address: P.O. Box 89321 City; Sioux Falls State/Zip: SD/57109 EIN/SSN: PH ■J- E-Mail: [email protected] Subcontract Description: Plumbing □ HVAC □ Electrical □ or Other (describe below) » Reviewing information, travel to Technical Review Committee (TRC) meeting(s), participation in the TRC, and providing input to report prepared by others

I Agreed-Upon Subcontract Value: $15 Approx Start Date: 02/01/2012 Approx End Date: 05/31/2012 Subcontractor Signed Letter of Assent □ (if Prime Contract is subject to a Project Labor Agreement) SubcontractoHs DSBS-certIfled as: M/WBE □ EBE □ or LBE □ (check all that apply & note status below) I Application Pending □ I Intends to Apply □ I NO □ '(ESQ Subcontractor Prevailing Wage or Living Wage Statement (if applicable) □ Subcontractor’s Experience Modification Rating (EMR): (Letter from insurance carrier to verify rating 311 must be included). Prime Contractor Certification: I heretw-a^rm that the information supplied is true and correct.

Signature of Prime Contractor Title Project Manager Print Name Thomas P. Kwiatkowski Date 2.1^/f

Iir^4W^:^^;a»^^WAGENCYcPRELIMINARY.;REVlEW7JPLEASE:SEEPAGE2FORINSTRUCTIONS£ Agency Preliminary Review Completed By; Date III i.VENDEX'C "2. Employment □ 3. References □ 4. plA' Q-'' 5. Apprenticeship □ 6. Licenses □

For each of the boxes checked in the agency preliminary response above, I have informed the Subcontractor of all relevant requirements and provided all requested documentation. Initials: Date

b Final Agency Approval:

Signature; GrantedD DeniedD

Date

w . lfSutTcontract?dAm^^ lEnter^njftReyis^’^ount.AndJ^

MOCS Subcontractor Approval Form (Sept. 2010)

NYC-WTC_000159324

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000159324Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →