NYC-WTC_000151217
Memo outlining cancellation policies, HVAC inspection deadlines, and resident notification procedures for WTC cleaning contractors.
1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗Summary table of total requests for cleaning and testing services by category and contractor from the DEP.
NYC-WTC_000156368–000156369Folder label: “BUILDINGS LISTS”

OCR status: ok · source: pdftotext
z. z - o o <D
§ '2 o o A B C D Total Remarks TJ c CT o' Oi o "□ Ca3 1 Total requests (Cleaning & testing) 1420 1336 1457 1157 5370 o 03 03 CO 2 Apts. Cleaned 277 680 381 142 1480 Contractor information O o o c 3 Apts7 common spaces(multiple) to be cleaned 1143 656 1076 1015 3890 3 CD 3 4 Number of Apts./ common ices(multiple) to be cleaned/day 21 12 20 18 71 0 5 Total requests (Testing only) 277 292 268 411 1248 6 Apts tested 46 62 55 188 351 7 Apts to be tested 231 230 213 223 897 8 Number apts to be tested / day 4 4 4 4 16 g 0 n 9 Total number of bldgs for HVAC / Exhaust evaluation 46 26 44 20 136 10 Total number of buildings cleared 0 11 Total number of bldgs to be evaluated /week 15 9 15 7 45
Assumption 1. Five days of deaning and testing for next eleven weeks. 2. Al HVAC /Exhaust evaluations to be completed by Feb. 22,2003
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000151217
Memo outlining cancellation policies, HVAC inspection deadlines, and resident notification procedures for WTC cleaning contractors.
1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151214
Memo outlining cancellation policies, HVAC inspection deadlines, and resident notification procedures for WTC cleaning.
1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140763
Summary table of total requests, apartments cleaned, and buildings cleared for HVAC evaluation across multiple contractors.
1 shared topics · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151158
Status report tracking completion dates for common area and HVAC cleaning at multiple Manhattan addresses during March 2003.
1 shared topics · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151173
Report listing scheduled clean and test appointments and accomplishments by quadrant for the period of March 10 through March 16, 2003.
Similar document embedding; no shared entity or topic indexed. · similarity 0.866
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139955
Summary table of HVAC and exhaust systems by quad, including total units and cleared counts.
Similar document embedding; no shared entity or topic indexed. · similarity 0.837
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000144248
Agenda for a joint meeting covering Clean & Test progress, HVAC updates, and summary of results.
Similar document embedding; no shared entity or topic indexed. · similarity 0.835
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139787
DEP memo forwarding an initial draft of a FEMA matrix document related to World Trade Center cleanup planning.
1 shared topics · similarity 0.833
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162325
Forwarded EPA memorandum concerning an asbestos reservoir inspection conducted on June 9, 2002.
1 shared topics · similarity 0.832
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163273
Contractor notifies DEP of a $220,000 change order for additional time and money on the Warren & Panzer air monitoring contract.
Similar document embedding; no shared entity or topic indexed. · similarity 0.831
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151229
Fax cover sheet from the New York City Response and Recovery Office to EPA Region 1 in November 2002.
1 shared topics · similarity 0.831
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140004
Spreadsheet listing specific buildings with their BIN numbers, unit counts, and status regarding HVAC inspection participation.
Similar document embedding; no shared entity or topic indexed. · similarity 0.829
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000156254
Notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of.
Filed in the same folder
NYC-WTC_000156255
Notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of.
Filed in the same folder
NYC-WTC_000156262
Fragmented data sheet containing numerical records likely related to building inspections or environmental monitoring.
Filed in the same folder
NYC-WTC_000156271
List of buildings including addresses, block/lot numbers, and owners for DEP environmental review purposes.
Filed in the same folder
NYC-WTC_000156302
Header page from a DEP document in the BUILDINGS LISTS folder showing agency and bureau information.
Filed in the same folder