15 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗114 LIBERTY 2 OF 2
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000155407–000155421
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 7 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
6 of 6
NYC-WTC_000155416
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
15 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155174
Chain of custody documentation for cleanup and monitoring samples at 114 Liberty distributed among project team members.
15 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
15 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138897
Internal DEP coordination regarding comments on 114 Liberty procedures and preparation of a response.
15 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162838
Correspondence regarding Schedule A forms and a draft scope of work for cleaning and air monitoring contracts at the site.
14 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162815
Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…
14 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 6 pages · confidence 0.15 · verify page 1
- 114 LIHERTV STREET · 1 pages · confidence 0.70 · verify page 15
- 125 Cedar Street · 1 pages · confidence 0.70 · verify page 4
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000155258
Notice instructing that original World Trade Center documents must be preserved as evidence and not disposed of.
Filed in the same folder
NYC-WTC_000155259
Notice instructing that original WTC documents must be preserved as evidence and not disposed of.
Filed in the same folder
NYC-WTC_000155264
Letter from EPA official to a Congressional representative criticizing the adequacy of the 114 Liberty Street cleanup.
Filed in the same folder
NYC-WTC_000155286
Formal letter criticizing the EPA and DEP for alleged failures in cleaning asbestos and silica from 114 Liberty Street.
Filed in the same folder
NYC-WTC_000155293
Congressional press release citing evidence of persistent WTC dust contamination at 114 Liberty Street.
Filed in the same folder