NYC 9/11 Public Portal Document
World Trade Center Indoor Dust Cleaning Program
Cleaning Contract Scope of Work
DRAFT - 8/1/02
A. Introduction
All work performed under this contract entered into between the New ^■^ity Depa^^^^H
Environmental Protection (DEP) and the cleaning contractor must 1| Im complianj^Anfi^H
applicable laws and regulations, including but not limited to regulation^ isued by th^hmned Sta®
Environmental Protection Agency (EPA), the United States Depart A It of Lab|ADccupational
Safety and Health Administration (OSHA), the New York State Depa® k^Ar (NYS DOL),
and the New York City Department of Environmental Protection (Di B
The EPA and DEP will solicit participation in a direct assistance l^ents and
residential building owners south of Canal Street who are concerned^ their ^b^have
debris/dust from the collapse of the World Trade Center (WTC). A DEP/EPA tele
been established to receive requests from the public. The a^ include v3i
including cleaning within residences and common spac^^B Itestos conti I^^Awith
follow-up asbestos sampling, asbestos air sampling onlv ■ovi ^A^ency p; fceulate air
(HEPA) vacuums. A
NYS DOL licensed asbestos contractors shall pei m cleani Activities I^A^ts who wish to
have their homes cleaned. An independent JBM coring Cl ^ctor will s redule and monitor the
work, perform a visual inspection, and^^B^ 1 asbea air samphJ
completed.
The pui-pose is contract is to^H
with DEP^^B b^OL cert^^^^
he serviced
'I when the cleaning is
licensed asbestos contractor
I for the pe" ^^^^f cleaning activities at residential
buildings^^H ^^^he coll^^^B W'ld Trade Snt^. The scope of work for the cleaning
activities i^lB clean in^B 11 supply all equipment and supplies necessary to
perform the wct this
B. Roles and Ri
As providedj nstai ’s On-Mgfie Coordinators shall have the authority of Project
Manage^^^dition to DE^ bjiager. As such, the EPA On-Scene Coordinators’ authority
shall IuAFcIc the following ai l^d to cleaning work conducted under this contract;
1. The authority to stop k for health and safety reasons.
The authority to st^^ork for non-compliance with the Scope of Work.
;ive technical direction to the contractor in the performance of the work.
1
NYC-WTC_000154318
OCR can misread numbers and units. Confirm readings against the page image before using them.