Roof Clean-Up
Application: This procedure utilizes wet methods and careful hygiene protocol for cleaning roofs
contaminated with asbestos containing material (ACM).
1. The entire roof shall be considered the work area. All abatement will be performed by NYSDOL
licensed contractors with NYC DEP certified workers.
2. A changing area consisting of two adjacent step-off pads located on the roof immediately adjoining
die roof entrance/exit. This area shall consist of a clean pad and a change pad. The clean pad shall
be adjacent to the building interior access way (or at the point of entry to the roof for exterior
access). The change pad shall be adjacent to the contaminated roof areas. Each pad (change pad and
clean pad) shall consist of two layers of 10-mil reinforced plastic on the roof/access way surface and
shall be large enough to facilitate changing and decontamination as described herein. A minimum of
4’ X 4’ is recommend, though the exact configuration will be specific to the roof.
3. Workers shall first step from the building interior (or exterior at the point of entry to the roof)
direutly onto the clean pad. On the clean pad, each worker shall be double suited with disposable
coveralls, plastic booties, gloves, and head coverings. Rubber boots may be used instead of the
plastic booties. The boots shall be wet wiped and HEPA vacuumed prior to leaving the roof. Each
worker shall wear a minimum of a half-face air-purifying respirator equipped with HEPA cartridges.
4. All penetrations at the roof shall be cleaned by wet methods/HEPA vacuum and sealed with
polyethylene sheeting.
5. Roof cleanup shall begin at the entrance/exit and proceed in a path working away from the
entrance/exit. Water shall be the primary engineering control to minimize the potential for fiber
release.
6. Roof surfaces shall be wetted and then wet cleaned using wet wiping techniques with water, mops,
rags, brushes, etc. HEPA vacuuming may also be used as alternative to or in combination with wet
cleaning.
7. Throughout the procedure, all personnel entering or existing the roof shall observe the personal
decontamination practices. Attention shaP be paid to limiting unnecessary walking on or disturbance
of material on the roof. These personal decontamination procedures shall be adhered to strictly in
order to minimize the potential for spreading contamination to the interior of the buildings.
8. Solid nonporous objects, such as metal patio furniture, plant potters, and plastic furniture cushions,
shall be wet wiped with damp rags. Wooden objects such as decking shall be HEPA vacuumed, wet
wiped, and lightly brushed with a bristle brush utilizing simultaneous misting and local HEPA
exhaust. Woven materials snail either be disposed as ACM or bagged and removed off-site for proper
laundering in accordance with 29 CFR 1901. 1001. Potted plants with visual contamination should
be disposed as ACM waste unless the owner requests decontamination. Potted plants will be
repeatedly rinsed, and provisions shall be made to catch the runoff water (i.e. into ACM disposal
bags or by using rags and HEPA wet-vacs).
9. Air Monitoring shall be performed by NYSDOL licensed a Third Party Air Monitoring firm with
certified workers. At a minimum, air sampling shall be performed at the interior of the building
entrance to the roof.
February 27, 2002