hours of the contract award. The DEP estimates the clean up of approximately 50 buildings per
contractor. The DEP expects contractors to provide four to five crews with a minimum of five
handlers per day. Multiple building roofs shall be cleaned simultaneously.
Work shall not be performed at any building found to be structurally unsound.
An ACP7 form signed by the building owner, contractor, and air monitoring firm must be
submitted directly to the DEP. The filing fee is exempted.
The sites and specific areas to be cleaned shall be determined and specified by the DEP.
The contractor shall restrict access by the public to the work area (s) during clean-up activities.
Caution tape and warning signs shall be used to identify work areas. Access shall be limited to
the contractor, his employees, and Federal, State or local officials.
The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose
collected waste. The contractor is responsible for supplying all necessary equipment.
The DEP will attempt to make arrangements with building owners/occupants for power and
water. The contractor shall have electrical generators available on site in the event electrical
power is not available.
The specific clean-up procedures for building roofs are attached. The DEP shall consider
substitution of the specified methodologies only if the request is received in writing. Any
substitutions must receive prior approval by the DEP.
Contractor Qualifications
The contractor shall have on staff and assigned to this contract a sufficient number of properly
trained and certified workers. See above.
The contractor shall have the contractor’s insurance carrier issue to the DEP a listing of all
coverage.
Bids
The bid sheets which accompany this document must be completed in full and faxed or hand
delivered to the DEP office. Incomplete bid sheets shall be rejected.
Any questions may be directed to R. Radhakrishnan, P.E„ Director Asbestos Control Program at
(718) 595-3718.