A list of specialized contractors was compiled specifically for this procurement. Staff from the BEC
solicited the following contractors by telephone:
Riverpoint Environmental Consultants
Pednault Associates
Independent Testing Labs
Environmental Testing Labs
National Testing Labs, Inc.
Two bids were received:
Riverpoint Environmental Consultants, and
Pednault Associates.
Riverpoint Environmental Consultants (“REC”) submitted the lowest bid.
REC’s bid was $1,900 per day plus $80 for each Transmission Electron Microscopy
sample. The maximum amount of the contract was $25,000. However, during the
course of work and given the magnitude of the tragedy, DEP soon realized that costs
would exceed the Small Purchase limit of $25,000. Therefore, in accordance with
Section 315 of the Charter, on September 21, 2001, Commissioner Miele orally issued
a Declaration of Emergency. Due to administrative delays resulting from the tragedy,
the written Declaration of Emergency was not signed by Commissioner Miele until
October 19, 2001. After I consulted with the Law Department and the Comptroller’s
Chief Engineer, I informed the BEC that, based upon the low bid that REC submitted,
REC could continue to perform work pursuant to the Declaration of Emergency, up to a
maximum contract amount of $400,000.
DEP has let the following two related emergency contracts:
1) Contract WTC-SCHL to provide daily emergency air sampling and
monitoring at various schools in the vicinity of the World Trade Center
site; and
2) Contract WTC-REM to provide emergency round-the-clock asbestos
remediation, including clean-up and removal at various sites in the
vicinity of the World Trade Center site.
On September 13,2001 the Corporation Counsel and the Comptroller jointly issued a blanket approval
for all emergency contracts related to the events of September 11, 2001.