NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 11/LAND FILL
Document / 73 pages

Environmental Health and Safety Plan draft for Staten Island Landfill,

Machine-extracted title · confidence 95%

Review draft of an environmental health and safety plan for debris operations at Staten Island Landfill.

NYC-WTC_000150335–000150407

Folder label: “LAND FILL

Page image
Scanned page image, NYC-WTC_000150380
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Staten Island Landfill Debris Disposal Operation Health and Safety Program

4.2.9 Gas Extraction Well Heads

Gas extraction well heads extend above grade approximately 4 feet. The recovery well heads are present throughout the exclusion zone, non-regulated areas, and other parts of the site and poses a significant hazard to the safety of the site workers, if the casings are breached. Vehicular traffic should stay clear of the well heads. Well heads in areas of active site management and operation shall have the following protection:

Preformed concrete barriers, bollards, or other physical barriers should be installed in such a fashion that if the barriers are impacted and knocked over, they will not strike the well head.

High visibility flags should be extended above the well head to a height that will able to be seen by mechanical equipment operators. Flags will be mounted to poles.

Blinking lights should be included on the flagpoles at night for additional visibility.

4.2.10 Grounding and Lightning

Grounding of electrical equipment, generators, and onsite structures shall be grounded in accordance with Section 11 of EM 385-1-1. All installations shall comply with applicable National Electrical Safety Code (NESC), National Electrical Code (NEC), and United States Coast Guard regulations. Onsite structures need to be grounded in the event of lightning strikes and static discharges. The following general guidelines are provided in addition to EM 385-1-1:

Sprung Structures- The Sprung Structures would normally be grounded by means of the two rods at each column base that are driven 5 feet into the ground. If the Jersey barriers are used it would be recommended that one rod at each column base be dri\^n into the ground and welded to the column base.

43

NYC-WTC_000150380

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000150380Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →