NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 11/FORM LETTERS
Document / 12 pages

DEP letter on exterior debris survey results, 2002

Machine-extracted title · confidence 90%

Letter informing building owners that DEP surveys identified visible World Trade Center debris accumulations on their property exteriors requiring cleanup.

NYC-WTC_000150172–000150183

Folder label: “FORM LETTERS

Page image
Scanned page image, NYC-WTC_000150175
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

May 1,2002 draft C:\WINDOWS\TEMPORARY INTERNET FILES\OLK21C2\BLDGFACD.DOC

2. Grant of Access. Subject to the terms and conditions hereof, Licensee and its agents, contractors and employees shall have the right, at all times while this License Agreement is in effect, to enter in and on the Premises, and to cross the Premises, with personnel, material and equipment, for the purpose of performing the Cleaning Work. It is expressly understood that the right granted under this Section 2 includes:

(a) the right to access all portions of the Premises deemed necessary by Licensee or its contractor(s) in order to properly perform the Cleaning Work, including (without limitation) roofs, parapets, window ledges, and other building exterior surfaces; and (b) the right to temporarily occupy portions of the ground outside of the building located on the Premises, with personnel, material and equipment, in order to perform the Cleaning Work; and

(c) the right to erect, maintain, and store temporary scaffolding on the Premises, and to utilize such scaffolding for the purpose of performing the Cleaning Work.

3. Limitations And Conditions;

a) In no event shall the Licensee, its agents, contractors, or subcontractors enter the Licensor’s property for the purposes of performing the Cleaning Work other than between die hours of 8:00 a.m. and 8:00 p.m.

b) Licensee shall provide the Licensor with written notification of its intention to begin the Cleaning Work at least two (2) days prior to the commencement of such Work.

c) Licensee shall pay the entire cost of all work, labor, and material in connection with the Cleaning Work undertaken by it hereunder except that the Licensor shall supply and pay for all power and water usage in connection with die Cleaning Work.

d) Licensee, its agents, subcontractors, and assigns, shall perform all , Cleaning Work promptly and in a workmanlike manner with a minimum of disturbances to the Licensor’s property.

2

NYC-WTC_000150175

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000150175Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000150065 · Box DEP Box 11

Guidance issued by DEP to building owners outlining procedures for cleaning dust and debris potentially containing asbestos.

Filed in the same folder

NYC-WTC_000150067 · Box DEP Box 11

Instructions for building owners regarding the safe removal of debris inside structures following the World Trade Center attack.

Filed in the same folder

Compare copies and versions →