NYC 9/11 Public Portal Document
NYC Department of Environmental Protection
Bureau of Euvironmental Compliance
Air Monitoring S^eme
LA
No Locations Type Remarks
1 PS314K Background Manual sampling by
330 59* Street, Brooklyn NYSDEC
2 PS 199 Background Continuous sampling by
30-20 48* Street, Queens NYSDEC
3 600 East 6* Street Continuous sampling by
Manhattan NYSDEC
4 Susan Wagner High School Background Continuous sampling by
1200 Manor Road NYSDEC
Staten Island
5 Ground Zero Will be conducted by D£P
6 Ground Zero Will be conducted by DEP
1. Sampling at the above locations will commence on September 14,2001
2. A minimum of three samples will be collected at each location with a sample volume of 1800
liters and maximum flow rate of 1S liters/min.
3. The samples will be analyzed for both PCM and TEM.
4. The results of the samples will be faxed to DEP by 9:00 A.M. the following day.
5. Please note that the sampling locations are subject to change.
avoc’s
1. Broadway & 21“ Street, Queens
2. 138* Street & 3"* Avenue, Bronx
3. Central Park North & Lenox
4. Bay Street & Victory Blvd.
m. Others
Ground Zero Sampling (in cooperation with EPA) for
a. Freon
b. Phosgene
c. VOC’s
NYC-WTC_000144525
OCR can misread numbers and units. Confirm readings against the page image before using them.