NYC 9/11 Public Portal Document
Greemvich Street and Church Street
.. .G
Reconnecting Greenwich Street Mt-T,
through the World Trade Center
T
J; CITY
a ’ HALL,
site is critical in fulfilling the goal
\ ' \v\^v-seY:ST , CM
of connecting Tribeca with the nas
M
' '-.'M
cent residential neighborhood i T’yTr
- .1 /
south of Liberty Street and ensur
,M... '"w
ing that the redeveloped WTC site I
Mo /. M
will not be a barrier to north-south ■
links. The restored Greenwich
Street has the potential to be a
I ■*w4
vehicular street, a pedestrian path,
or both. Studio Daniel Libeskind's
t A' J
t /Mr f
/■
design envisions connecting a new
Greenwich Street with West
IBBmmt ,.........
Broadway, which currently ends at \ ' ■ ..my
rhe WTC site, to create a seamless
link with Tribeca. Church Street,
one block east, could complement Restoring and pairing critical north-south streets.
the new Greenwich-West
Broadway route to create a system
tor local north-south trips.
%
V
I
View looking north up Greenwich Street. Rendering by Studio Daniel Libeskind.
I .ower Manhattan rransportation Strategies
NYC-WTC_000143098
OCR can misread numbers and units. Confirm readings against the page image before using them.