Quality Costs Less
We specialize in demolition, asbestos abatement, building
renovation, hazardous material removal, soil remediation,
and dynamic compaction. Our work force consists of over 500
full-time, trained, and experienced employees, company wide.
COKE WORKS Bethlehem PA
BetUehein Steel looked to Brandenburg to provide a complete closure
plan for Ae i6o-acre Coke plant including demolition, asbestos
abatement, and environmental remediation which once completed
induded;
1500 tons of high level benzene oil and sludge,
6000 tons of hazardous and special wastes,
4
4
390 tons of friable asbestos, and
JOO,000 gallons of benzene contaminated water.
Friable asbestos was surveyed, identified, and abated wiAout incident.
j
High level benzene oil and sludge was recycled wiAout cost as fiiel
additive. Costs were limited to handling and transportation.
A photo of the IBO-acre Cote Works site was taken before the remediation project began
The magnitude of the benzene contaminated water accumulation in March of 1998. The project was successfully completed in Jarruary of 2002.
supported specialized treatment using a state-of-Ae-art ozoni2a.tion
process. The ozonization process generated water which met stan
1 dards for non-hazardous industrial water effluent.
I
i
SOLDIER FIELD Chicago IL
TBMK (Turner Barton-Malow Kenny) looked to Brandenburg to
perform near-total deinoliiion of Ae stadium’s existing interior.
Almost itninediately after Ae Chicago Bears completed Aeir zoot
season. Brandenburg worked 24 hours a day, 7 days a week. The
workforce consisted of two crews of 50 to 60 workers on two 11-hour
A '1
shifts. These two Aift-s were able to load up to 550 truckloads per 24- Wl
hour period. Brandenburg completed 95 percent of Ae demolition
contract of Ae stadiums interior structure and removed an additional
t 80,000 cubic yards of contaminated soil in just jo days, which was
two weeks Aead of an already aggressive projea .sAedule.
“Brandenburg has taken a six monA job and finished it in 30 days.”
K -Alan SmiA, General Supt. of TBMK (Turner Barton-MaJow Kenny)
The intaior of the legendary stadium is being completely renovated to produce a modem
facility loaded with fan- anti franchise-friendly Bioenities such as luxury suites, licensed
seating opportunities, immense video screens, and new concession stands and restrooms.
Ml Illinois Office 866.844.5800 | MiAigan Office 866.744.2500 | Mid-Atlantic Office 866.744.1800 www.Brandenburg.info
I'
■!
Bi
ft
NYC-WTC_000142975
OCR can misread numbers and units. Confirm readings against the page image before using them.