NYC 9/11 Public Portal Document
'f . I ’■
-hl TECHNOLOGY. GAS
in the SEV combus- the Klamath cogeneration plant—ajoint
tor before being development of the city of Klamath Falls,
expanded for a Ore., and PaciflCorp, Portland, Ore.
1 second time in the Started up in summer 2001, the award-
( low-pressure tur- winning Klamath plant features two Sie-
bine. Alstom had mens Westinghouse 501FD GTs in com-
to assemble a large bined-cycle operation.
team of engineers On top of the efficient combined cycle,
to redesign and Klamath adds a cogeneration process—
progressively im- exporting up to 275,000 Ib/hour of 325-
plement modifica- psi steam to an existing wood-products
dons across its fleet facility for even greater overall thermal
of troubled GT24s, efficiency. Aging, inefficient boilers at
and set aside $800 Collins Wood Products were curtailed
( million to negoti- when the cogen plant came on line, sav
ate settlements with ing fuel and reducing net air emissions.
its customers. The Klamath plant achieves further
While manufac- environmental benefits through funding
turers and users carbon-offset projects, such as reforesting
improve the dura- underproducing private lands in Oregon,
mODEL PROJECT Klamath plant adds cogen to combined cycle, bility of F-class GTs, recovering methane from underground
the number of coal mines to fuel engine-based power-
i EV combustor and the sequential EV units in the field continues to grow, plants and expanding the Klamath Falls
combustor, with a single-stage high-pres- From coast to coast, an estimated 48,000 geothermal district-heating system.
sure turbine in between. Downstream of Mw of GTs entered service in 2001, Another high-profile GT project is the
the SEV combustor is a four-stage low- 66,000 Mw are planned to start up in 320-Mw Sunrise facility, which entered
pressure turbine. Hot gases from the EV 2002 and 69,000 Mw in 2003 (see Power- commercial service last June in Kern
combustor expand through the high- plant Construction p. 63). County. Calif. Built by Black & Veatch,
pressure turbine and then are reheated A model of advanced CC projects is Kansas City, for a joint venture led by
3*
mIOs!.
IRON J4OUNWiN» MtQilQAN
M. J. ELECTRIC, INC.
An Exelon Infrastructure Services Company
__ i 1
Your Single Source for
4 Construction
Over 40 Years of Power Plant Experience
(Coal Fired, Gas, Hydro & Wind Turbine)
Power Block Electrical Construction
!■
Process Controls & Instrumentation
Wiring, Tubing and Calibration
Substation & Switchyard Construction
Transmission Line Construction
Scrubber & Precipitator Installations
Home Office: 200 W. Frank Pipp Dr. ■ P.O. Box 686 ■ Iron Mountain, MI 49801
www.mjelectric.com Contact: Wayne Gardner at (906) 776-4481 or FAX (906) 779-4217
36«POWERPLANT CONSTRUCTION
NYC-WTC_000141979
OCR can misread numbers and units. Confirm readings against the page image before using them.