NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 06/DEP 59.17 Junction Blvd, 11th FL
Document / 52 pages

Illegible form or record, date and subject unclear

Machine-extracted title · confidence 15%

Form document with significant degradation or scanning quality issues making content indecipherable.

NYC-WTC_000141870–000141921

Folder label: “DEP 59.17 Junction Blvd, 11th FL

Page image
Scanned page image, NYC-WTC_000141911
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Associate Research Engineer Project Managers RECRUITMENT (Industrial Engineering) and Estimators Misener Marine, headquartered in Tampa, Florida Engineers United Technologies Research Center has an Montgomery Watson Harza, a leading inter­ specializes in the construction ofheavy civil marine immediate opening in its East Hartford, national consulting engineering firm, has the and engineering projects. We ate curtendy looking Connecticut office for an Associate Research following position available in its Chicago, for Project Managers and Estimators. We ate Engineer (Industrial Engineering). IL, Utica, NY, Oakland, CA, BeUevue, WA seatchitig for construction professionals who have and Milwaukee, WI offices. Qualified candi­ Use operations research technologies and soft­ a bachelor’s degree from a four-year college or uni­ dates wiU possess an engineering degree in all ware tools to improve manufacturing and sup­ versity in civil engineering. Marine construction disciplines including civil, structural, mechan­ ply chain metrics. Identify problems, define required. Salary commensurate with experience. ical, electrical, and environmental. For more requirements, develop models, generate soft­ information about Harza, visit our website at ware solutions, and deploy solutions into value­ Excellent benefits package includes company pro­ vided health insurance, employer sponsored 401k www.harza.com. (Qualified candidates should adding usage to achieve improvement in facto­ submit resume with salary requirements ry and supply chain metrics. plan and a first-class working environment. (including AD#) to [email protected] or send the Please e-mailyoter resttme to: same to: Montgomery Watson Harza, Attn: Must possess a Ph.D. or its equivalent in [email protected] Human Resources, Ad#16, 175 W. Jackson, Industrial Engineering, Operations Research or or fax to 720-494-8019 ate Human Resources Chicago, IL 60604. Fax: 312-831-3961. EOE a related field and relevant experience, includ­ M/F/D/V____________________________ ing author/co-authorship of journal articles in ’misener.■ Superintendent & Project Manager the use of operations research technologies or the use of software tools to improve manufac­ ■ S.E. hospital project. Salary $100k. turing and supply chain metrics, software pro­ Healthcare exp. req’d. Fax resume to 770- gramming, database design, optimization soft­ Construction Coordinator 632-2815, or phone 770-632-6585. ware (such as ILOG or CPLEX) and discrete CON-WAY Transjwrtation Services, Inc., a $2 Automation Group Service Manager event simulation. billion transportation company, is seeking a TRUMPF Inc. has an immediate opening in Construction Coordinator in the Property its Farmington, Connecticut office for an Resume and/or cover letter must reflect each Development Department at its corporate requirement above and specify reference code Automation Group Service Manager. headquarters in Ann Arbor, MI, to help facili­ Manages the activities of all Field Service AREIE or it will be rejected. tate our continued growth. Other Midwest and Technical Support Engineers to ensure Forward resume to: offices may be available. Duties consist of customer satisfaction and overall quality Donna Juttner project oversight of general contractors result­ assurance of products and services by coor­ United Technologies Research Center ing in award of contracts, project start-up, on­ dinating the Automation Group’s product 411 Silver Lane site inspections, detection and resolution of installations, repairs and programming of East Hartford, CT 06108 project-related issues. Such issues may consist software for CNC machines. Must possess of quality, conflicts, directing architects and at least a two-year technical degree in engineers, processing change orders and pro­ Engineering and relevant experience, ject closeout for multiple projects in several including an electrical/mechanical back­ states. Design experience is Referred and devel­ ground, knowledge of the metric system and JOIN A opment experience is a plus. Candidate will possess a minimum of 5 years of demonstrat­ ed construction management experience in experience programming software for CNC machines. Resume and/or cover letter must reflect each requirement above and specify WINNING facilitating, administering and managing con­ struction contracts for diversified projects con­ sisting of civil site work and commercial build­ reference code AGSM or it will be rejected. Forward resume to Heather Durfey, TRUMPF Inc., Farmington Industrial Park,

■i TEAM! ing projects. Candidate wiU also possess a Bachelor’s Degree in Construction Manage­ ment, Engineering or equivalent. Experience 111 Hyde Road, Farmington, CT 06032. Industrial Engineer Shawmut Design and Construction, and proficiency in the use of PC with Windows Req: Bachelor Degree in Industrial Eng. or 98 and Microsoft Office applications (Word, Mgmt. Eng. Must be able to read construc­ a leading construction management firm, Excel, Project, etc.) Internet collaboration and tion working drawing, and able to conduct is looking for experienced Project AutoCAD experience is preferred. Become a on-spot measurement, survey and mapping. member of our successful team. CON-WAY Duties include: Assess the cultured marble Management, Estimating, and Construction offers a competitive compensation and excel­ production process techniques and equip­ professionals. At Shawmut you will find an lent benefits package in an energized environ­ ment to determine a more efficient operation; p ment where team performance is rewarded. determine quality and quantity of production extremely energetic work environment, with For immediate consideration send your resume, according to client’s sp^ification in the con­ an excellent opportunity for advancement complete with salary requirements, to: CON­ struction working drawing; conduct on-spot WAY Transportation Services, Inc., Attn: Human measurement, survey and mapping to deter­ generous compensation, employee stock Resources CC1201, 110 Parkland Plaza, Ann mine the actual need of equipment and mate­ ownership, 401 (k), tuition reimbursement Arbor MI 48103. Fax: (734) 214-5651. E-mafl: rial for production; assist products and facil­ I and a chance to work on challenging, [email protected]. Visit our web site at www.con-way.com. EOE ities development and renovation; responsi­ ble for daily production, material inventory high-profile projects. GareerSMITH, Inc. control and production workers’ efficiency. 40hrs/wk, 9-5, $43k/yr. Send resume to If you're interested, We’re an established, nationally known recruit­ Curtis Cochran at 188 Industrial Park Cir., submit your resume to: ing search firm focused exclusively on the E&C Lawrenceville, GA 30045, or fax it to 770- [email protected] industry. We recruit for the top E&C companies 963-5933, Job Code: ZY-01._____________ or by fax: 617-656-7014 from entry-level engineers to the most senior executives. Visit www.careersmith.com for aU Structural Engineers or visit vwwv.shawmut.com current openings.______________________ No recrutters please. SHAWMUT WeidUnger Associates has immediate openings for entry and experienced level Structural Design and Coostroction Chief Estimator Engineers at our Cambridge office. Please /Arizona location. Run dept. Salary com­ send resume to Stephen Lew, Principal, SEO Hafriam Awnua, Boston, MA (Bitt mensurate with experience. Phone 501-932- Weidlinger Associates Inc., One Broadway, 0040 Fax 501-932-0042 11th Floor, Cambridge, MA 02142. 40 ENR/December 17, 2001

NYC-WTC_000141911

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000141911Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Industry publication, December 2001 · Box DEP Box 06

NYC-WTC_000141922

McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.

40 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.983

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Cited alongside this record in an Ask answer

DEP Environmental Protection Invoices, 1999-2001

NYC-WTC_000137749

Archival folder label for Department of Environmental Protection invoices related to World Trade Center activities from 1999 to 2001.

Cited alongside this record in an Ask answer

Compare copies and versions →