O Supervising of Cleaning by On-site supervision conducted NYC Estimate based on o'
Contractor Conducting the by contractor 15,500 units. THIS ASSUMES "D
o
ro
Ca3
Cleaning CONTRACTOR 03
studio = 180,000 SPENDING 3-4 O
o
o
1BR = 960,000 HOURS PER JOB, c
3
2 BR = 2,400,000 DO WE WANT TO CD
3
3 BR = 960,000 INCREASE THIS?
4 BR = 240,000
TOTAL = 4740^
Oversight of Cleaning on a Monitoring contractor on-site NYC NEED ADDITION
Building Basis by Monitoring at every building during TO ESTIMATE FOR
Contractor cleaning. MONITORING
6
CONTRACTOR
ESTIMATE
Oversight by EPA of Cleaning EPA’s program oversight. EPA EPA’s salary costs =
and Monitoring Effort 2,953,607
EPA’s travel costs = 314,200
TOTAL = 3,267,807
6
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000141243Source: NYC Law Department, mirrored locally
Department of Environmental Protection transmits joint EPA and NYC materials to FEMA for review and consideration regarding World Trade Center environmental matters.