o Asbestos Abatement Cleaning Cleaning by contractor services NYC Estimate based on 5,000 units o'
Ca5
CD of significant dust to be cleaned. "0
o
CD
Ca5
accumulations. (Scope B) 9L
studio = 115,000 O
o
o
1 BR = 530,000 c
3
2BR= 1,500,553 o
3
3 BR = 570,000
4 BR= 175,000
TOTAL = 2,990,000
Supervising of Cleaning by On-site supervision conducted NYC Estimate based on
Contractor Conducting the by contractor 15,500 units. THIS ASSUMES
Cleaning CONTRACTOR
studio = 180,000 SPENDING 3-4
1 BR = 960,000 HOURS PER JOB,
2 BR = 2,400,000 DO WE WANT TO
3 BR = 960,000 INCREASE THIS?
4 BR = 240,000
TOTAL = 4,740,000
Oversight of Cleaning on a Monitoring contractor on-site at NYC NEED ADDmON
Building Basis by Monitoring every building during cleaning. TO ESTIMATE FOR
Contractor MONITORING
CONTRACTOR
ESTIMATE