Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Final air sample results, 55 Church Street, undated · page 86 · Box DEP Box 36NYC-WTC_000103604
One-hundred-eighteen page document from Testwell Laboratories presenting final air sample results for a lease at 200 Park Avenue.
Similarity score 0.971 (not a probability)
Fax transmission record, 52 Beekman Street, Oct 2002 · page 1 · Box DEP Box 47NYC-WTC_000118817
Fax transmission log page from October 29, 2002, associated with 52 Beekman Street.
Similarity score 0.969 (not a probability)
Chain of custody for bulk sampling at 345 South End · page 17 · Box DEP Box 48NYC-WTC_000120940
Document tracking environmental samples collected from Building #100 at 345 South End Avenue on October 22, 2001.
Similarity score 0.968 (not a probability)
Chain of custody for air monitoring at 345 South End · page 24 · Box DEP Box 48NYC-WTC_000120991
Record documenting the transfer and custody of air samples from Building #100 at 345 South End Avenue collected on October 22, 2001.
Similarity score 0.967 (not a probability)
OSHA air sample results chain of custody, 55 Church Street · page 94 · Box DEP Box 36NYC-WTC_000103467
Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
Similarity score 0.967 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 56 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.966 (not a probability)