Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Document page fragment, DEP Box 54, 2003 · page 173 · Box DEP Box 54NYC-WTC_000131928
Fragmented document page from the Department of Environmental Protection archive.
Similarity score 0.964 (not a probability)
Chain of custody for bulk sampling at 395 South End · page 114 · Box DEP Box 48NYC-WTC_000121516
Document tracking environmental samples collected from Building #600 at 395 South End Avenue on January 2, 2002.
Similarity score 0.951 (not a probability)
FAX transmission record, 94 Fulton Street, Oct 2002 · page 1 · Box DEP Box 52NYC-WTC_000127593
A fax cover sheet or transmission log dated October 29, 2002, associated with the 94 Fulton Street site file.
Similarity score 0.951 (not a probability)
EPA review letter, 133-135 Greenwich Street · page 37 · Box DEP Box 55NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.950 (not a probability)
EPA review letter, 133-135 Greenwich Street · page 38 · Box DEP Box 55NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.949 (not a probability)
Document fragment, DEP Box 33, unknown date · page 1 · Box DEP Box 33NYC-WTC_000096783
Fragmented document excerpt from DEP Box 33 containing illegible text and identification codes.
Similarity score 0.948 (not a probability)