Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001 Machine-extracted title · confidence 95% JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475 Save to case Cite this page ↗
More like this page Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
EPA work plan review, 133-135 and 21-23 buildings, August 2005 · page 63 · Box DEP Box 55 NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.969 (not a probability)
Asbestos removal variance correspondence, 130 Cedar Street, Jan 2005 · page 39 · Box DEP Box 50 NYC-WTC_000125698
Correspondence regarding DEP acceptance of a variance package for asbestos removal at 130 Cedar Street.
Similarity score 0.967 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 23 · Box DEP Box 36 NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.967 (not a probability)
OSHA air sample results chain of custody, 55 Church Street · page 27 · Box DEP Box 36 NYC-WTC_000103467
Chain of custody documentation for OSHA-compliant air sampling and abatement verification at the hotel located at 55 Church Street.
Similarity score 0.966 (not a probability)
NEWE Be Mn Sb Tl sample list, Dec 14 2001 · page 1 · Box DEP Box 59 NYC-WTC_000066857
Document listing environmental samples analyzed for beryllium, manganese, antimony, and thallium on December 14, 2001.
Similarity score 0.966 (not a probability)
NYC-WTC_000094202 · page 14 · Box Asbestos - BOX 5 Similarity score 0.966 (not a probability)