Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Air sampling summary letter, 225 Rector Place, Jan 2002 · page 174 · Box DEP Box 50NYC-WTC_000123875
Letter from environmental consultants summarizing ambient air sampling and cleanup activities at 225 Rector Place.
Similarity score 0.977 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 254 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.976 (not a probability)
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 125 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.976 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 56 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.976 (not a probability)
Asbestos and lead survey report cover, 130 Cedar Street, July · page 209 · Box DEP Box 50NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.975 (not a probability)
Asbestos analysis report for 19 Fulton Street · page 3 · Box DEP Box 52NYC-WTC_000129107
Transmittal letter accompanying TEM asbestos fiber analysis results for the 19 Fulton Street project dated June 2002.
Similarity score 0.974 (not a probability)