Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Document page fragment, DEP Box 54, 2003 · page 172 · Box DEP Box 54NYC-WTC_000131928
Fragmented document page from the Department of Environmental Protection archive.
Similarity score 0.973 (not a probability)
Facsimil transmission journal, March 10, 2003 · page 22 · Box DEP Box 35NYC-WTC_000101360
Automated fax transmission log record dated March 10, 2003 showing successful transmission to NYC DEP.
Similarity score 0.950 (not a probability)
Facsimil transmission journal, March 10, 2003 · page 14 · Box DEP Box 35NYC-WTC_000101360
Automated fax transmission log record dated March 10, 2003 showing successful transmission to NYC DEP.
Similarity score 0.944 (not a probability)
Lead in dust results letter, Liberty Street, Mar 2003 · page 24 · Box DEP Box 54NYC-WTC_000132108
Cover letter transmitting lead in dust sampling results for 114 Liberty Street.
Similarity score 0.938 (not a probability)
Chain of custody for environmental assessment, Nov 2001 · page 84 · Box DEP Box 02NYC-WTC_000095331
Chain of custody form documenting bulk sampling and air monitoring at 375 South End Avenue on November 17, 2001.
Similarity score 0.938 (not a probability)
Fax transmission journal entry, March 27, 2003 · page 4 · Box DEP Box 35NYC-WTC_000101163
Automated log confirming transmission of 4 pages to DEP lead tracking unit on March 27, 2003.
Similarity score 0.937 (not a probability)