Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
PCM air sample results chain of custody, 200 Park Avenue · page 19 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.972 (not a probability)
Bid response form for JLC Environmental Consultants, March 2003 · page 3 · Box DEP Box 35NYC-WTC_000102735
Contractor bid sheet and contact information from JLC Environmental Consultants regarding asbestos program services for 114 Liberty Street.
Similarity score 0.971 (not a probability)
Sampling summary report, PS/IS 89M, Feb 2002 · page 39 · Box DEP Box 02NYC-WTC_000096460
Cover letter summarizing wipe and air sampling results for asbestos and other contaminants at PS/IS 89M dated February 7, 2002.
Similarity score 0.971 (not a probability)
Asbestos fiber analysis report, 33 Liberty Street, July 2002 · page 2 · Box DEP Box 01NYC-WTC_000093357
Laboratory results for asbestos fiber analysis via transmission electron microscopy at 33 Liberty Street.
Similarity score 0.971 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 87 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.970 (not a probability)
Asbestos and lead survey report cover, 130 Cedar Street, July · page 209 · Box DEP Box 50NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.970 (not a probability)