Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Asbestos TEM analysis data, 125 [name], Sep 2002 · page 56 · Box DEP Box 38NYC-WTC_000107682
Chain-of-custody form containing transmission electron microscopy results for asbestos fiber analysis at a DEP cleanup project dated September 2002.
Similarity score 0.968 (not a probability)
TEM air sample results, 125 Liberty St, Oct 2002 · page 170 · Box DEP Box 54NYC-WTC_000131492
Chain of custody and cover letter for transmission electron microscopy analysis of air samples from apartments at 125 Liberty Street.
Similarity score 0.966 (not a probability)
Chain of Custody: DEP Cleanup Samples, October 24, 2002 · page 85 · Box DEP Box 53NYC-WTC_000130104
Chain of custody document from PSC Analytical Services regarding the receipt and analysis of samples for the DEP cleanup project.
Similarity score 0.965 (not a probability)
Chain of custody for unit ventilator lead wipe samples · page 94 · Box DEP Box 36NYC-WTC_000102902
Documentation tracking the collection and transport of lead wipe samples from unit ventilators at a World Trade Center site location.
Similarity score 0.965 (not a probability)
PCM air sample results chain of custody, 200 Park Avenue · page 132 · Box DEP Box 36NYC-WTC_000103205
Chain of custody forms for personal protective equipment and air sampling results conducted at 200 Park Avenue by Testwell Laboratories.
Similarity score 0.965 (not a probability)
Asbestos and lead survey report cover, 130 Cedar Street, July · page 316 · Box DEP Box 50NYC-WTC_000125204
Cover page for a survey report detailing asbestos and lead-based paint findings at 130 Cedar Street.
Similarity score 0.964 (not a probability)