Document / 214 pages
Daily construction report, NYC WTC site, Sept 2001
Machine-extracted title · confidence 95%JLC Environmental Consultants daily log of construction activities and observations at the World Trade Center site.
NYC-WTC_000132262–000132475More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
345 Chambers Street air test results and chain of custody, · page 161 · Box DEP Box 37NYC-WTC_000106418
A comprehensive chain of custody document containing final asbestos and lead air test results for the 345 Chambers Street school cleanup project.
Similarity score 0.970 (not a probability)
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 154 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.969 (not a probability)
Air sampling correspondence, 20 Dey Street, Feb 2002 · page 153 · Box DEP Box 36NYC-WTC_000103723
Cover letter dated February 22, 2002 from LMB Inc. regarding air sampling activities at 20 Dey Street and surrounding addresses.
Similarity score 0.968 (not a probability)
345 Chambers Street air test results and chain of custody, · page 110 · Box DEP Box 37NYC-WTC_000106418
A comprehensive chain of custody document containing final asbestos and lead air test results for the 345 Chambers Street school cleanup project.
Similarity score 0.968 (not a probability)
Chain of custody for air samples from 125 Water Street, · page 262 · Box DEP Box 53NYC-WTC_000129725
Custody form documenting the transfer and analysis of air samples collected at 125 Water Street in September 2002.
Similarity score 0.967 (not a probability)
Sampling summary report, PS/IS 89M, Feb 2002 · page 40 · Box DEP Box 02NYC-WTC_000096460
Cover letter summarizing wipe and air sampling results for asbestos and other contaminants at PS/IS 89M dated February 7, 2002.
Similarity score 0.967 (not a probability)